Zip HydroTap G4 BCS240/175 Installation And Operating Instructions Manual

Zip HydroTap G4 BCS240/175 Installation And Operating Instructions Manual

Advertisement

Zip HydroTap G4
®
Installation and Operating Instructions
BCS Models
Affix Model Number Label
Here
801910
801910 v3.05 09.20 HT BCS Commercial Instructions
Page 1 of 32

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the HydroTap G4 BCS240/175 and is the answer not in the manual?

Questions and answers

Summarization of Contents

Installation Checklist
Before Installation Steps
Review site requirements, space, water pressure, and power availability before installation.
Pre-Commissioning Checks
Verify correct unit installation, plumbing, electrical connections, and ventilation before commissioning.
Important Safety Instructions
General Safety & Operational Guidelines
Covers safety, refrigerant, qualifications, venting, lifting, airflow, altitude, and frost protection.
Positioning and Critical Warnings
Details unit positioning, general warnings, and specific CO2 cylinder safety precautions.
Site Preparation and Tools
Site Requirements Checklist
Ensure adequate space, support, power outlets, water supply, and ventilation for installation.
Special Tools Required
Lists specific tools needed for tap installation, like hole punches and spanners.
Ventilation Installation
Ventilation Requirements and Airflow
Explains the need for proper air circulation and recommended air gaps for the Command Centre.
Ventilation Cut-Outs and Kits
Details specific cut-out dimensions and optional vent kits for adequate heat dissipation.
Command Centre Installation
External Bypass Valve Setup
Guides on setting the bypass valve based on external filter configuration.
Hose and Tube Connections
Instructions for connecting water and gas hoses to the Command Centre unit.
John Guest Fittings and Carbonation Valve
Details John Guest fitting usage and carbonation valve installation/adjustment.
Model-Specific Hose Connections
Illustrates hose connections for various HydroTap BCS, AIO, and 5-In-1 models.
Booster Heater Installation
Booster Heater Product Details
Overview of the booster unit, its function, and specifications.
Booster Heater Installation Procedure
Covers site requirements, appliance mounting, and hose connections for the booster.
Filter and Softener Installation
Mounting and Connecting the Filter
Guidance on filter head mounting and cartridge installation, including flushing.
CO₂ Cylinder Setup
Cylinder, Regulator, and Hose Connections
Instructions for securing the cylinder, connecting the regulator, and attaching the gas hose.
CO₂ Regulator Gauge and Leak Test
Explains regulator readings and the procedure for testing gas connections for leaks.
Commissioning Procedures
CO₂ Purge and Filter Flush
Steps for purging CO2 gas and flushing the system's new filter cartridge.
Calibration and Booster Enablement
Procedures for boiling calibration, safety sensor calibration, and enabling the booster.
System Flushing and Flow Adjustment
Instructions for flushing the Command Centre and adjusting the carbonation valve.

Table of Contents