Use this checklist as a guide while preparing your site for the installation of the Varian 1200 or
1200L MS system. Make sure that your site meets all of the requirements detailed in these
instructions before you request installation.
Complete the Checklist
Refer to the appropriate topics in these instructions for more information about each item.
General Requirements
The installation area is in compliance with all
relevant safety regulations
The principle operator will be available during
the installation and certification period
Entrance to the lab is > 100 cm (36 in.)
The workbench can support the load of the
system
Sufficient bench space is available for all
equipment, including optional items
Environmental Requirements
The lab temperature can be maintained
between 15 and 30 ºC
The relative humidity can be maintained
between 40 – 80%
The lab is free of particulate matter
The system workbench is free from vibrations
The system area is free from electromagnetic
disruption and electrostatic discharge
There is a suitable exhaust system
Request Installation
When you have prepared your site in accordance with this checklist, contact the Customer Service
office in your region to schedule installation. Keep this checklist handy and review it with the Field
Representative when arranging the installation.
Please Note: If the laboratory is not ready for installation when the Field Service Representative
arrives, Varian, Inc. reserves the right to invoice for the Representative's time.
Pre-installation Checklist
Varian 1200/1200L Mass Spectrometer
Power Requirements
The specified electrical supply and power
outlets are available
Gas and Solvent Requirements
There is proper gas equipment
HPLC solvents available
Carrier gases are available
Appropriate lab glassware is available
Nitrogen at 99.999% purity
Argon at 99.999% purity
Air at 99.999% purity
Methane at 99.999% purity
n/a
n/a
n/a
n/a
n/a
n/a

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 1200L GC/LC/MS and is the answer not in the manual?

Questions and answers

Summarization of Contents

Site Preparation Checklist Overview
General Requirements Checklist
Overview of general site preparation items for Varian 1200/1200L MS installation.
Environmental Requirements Checklist
Overview of environmental conditions like temperature, humidity, and air quality.
Power Requirements Checklist
Overview of necessary electrical supply and power outlet specifications.
Gas and Solvent Requirements Checklist
Overview of required gases and solvents for system operation.
Installation Request Procedure
Steps to follow for contacting Varian to schedule the installation.
General Site Requirements
Operating Environment Conditions
Details on providing an acceptable operating environment for peak system performance.
Temperature and Humidity Specifications
Optimal operating temperature (18-21°C) and relative humidity (40-80%) guidelines.
Particulate and Vibration Standards
Requirements to minimize dust and ensure vibration-free benches.
Exhaust System Guidelines
Necessity of an adequate exhaust system for venting pump fumes.
1200 GC/MS Site Preparation
Entrance and Space Planning
Ensuring adequate passage width and bench space for the 1200 GC/MS system.
Power Supply Requirements
Specifies dedicated power sources needed for the 1200 GC/MS system.
Gas Supply Specifications
Details on required gases like methane, isobutane, and ammonia for CI mode.
Carrier Gas and Filtration
Requirements for Helium carrier gas and installation of a gas filter.
1200L GC/MS Site Preparation
Entrance and Space Planning
Ensuring adequate passage width and bench space for the 1200L GC/MS system.
Power Supply Requirements
Specifies dedicated power sources needed for the 1200L GC/MS system.
Gas Supply Specifications
Details on required gases like methane, isobutane, and ammonia for CI mode.
Carrier Gas and Filtration
Requirements for Helium carrier gas and installation of a gas filter.
1200L LC/MS Site Preparation
Entrance and Space Planning
Ensuring adequate passage width and bench space for the 1200L LC/MS system.
Power Supply Requirements
Specifies dedicated power sources needed for the 1200L LC/MS system.
Gas Supply Specifications
Details on required gases like Nitrogen and Air for system operation.
Solvent Requirements
Lists required solvents (methanol, DI water) and glassware for installation.
1200L GC/LC/MS Site Preparation
Entrance and Space Planning
Ensuring adequate passage width and bench space for the 1200L GC/LC/MS system.
Power Supply Requirements
Specifies dedicated power sources needed for the 1200L GC/LC/MS system.
Gas Supply Specifications
Details on required gases like Nitrogen, Air, and CI reagent gases.
Carrier Gas and Filtration
Requirements for Helium carrier gas and installation of a gas filter.
Installation Procedures and Logistics
Instrument Arrival and Inspection
Procedures for inspecting shipping cartons for damage upon arrival.
Unpacking and Setup Process
Overview of unpacking and system installation by a Varian representative.
Preventive Maintenance Guidance
Importance of routine and preventive maintenance for system longevity.
Technical Appendices
Module Dimensions and Weights
Table detailing space and weight requirements for system components.
Power Consumption Data
Specifications for maximum power draws for UPS systems.
Electrical Connector Standards
Illustrations of NEMA and CEE 7/7 power plugs and outlets.

Table of Contents