Varian 1200L LC/MS Pre-Installation Instructions

Mass spectrometer

Advertisement

NOTICE: Varian, Inc. was acquired by Agilent
Technologies in May 2010. This document is provided
as a courtesy but is no longer kept current and thus
will contain historical references to Varian. For more
information, go to www.agilent.com/chem.
Use this checklist as a guide while preparing your site for the installation of the Varian 1200 or
1200L MS system. Make sure that your site meets all of the requirements detailed in these
instructions before you request installation.
Complete the Checklist
Refer to the appropriate topics in these instructions for more information about each item.
General Requirements
The installation area is in compliance with all
relevant safety regulations
The principle operator will be available during
the installation and certification period
Entrance to the lab is > 100 cm (36 in.)
The workbench can support the load of the
system
Sufficient bench space is available for all
equipment, including optional items
Environmental Requirements
The lab temperature can be maintained
between 15 and 30 ºC
The relative humidity can be maintained
between 40 – 80%
The lab is free of particulate matter
The system workbench is free from vibrations
The system area is free from electromagnetic
disruption and electrostatic discharge
There is a suitable exhaust system
Request Installation
When you have prepared your site in accordance with this checklist, contact the Customer Service
office in your region to schedule installation. Keep this checklist handy and review it with the Field
Representative when arranging the installation.
Please Note: If the laboratory is not ready for installation when the Field Service Representative
arrives, Varian, Inc. reserves the right to invoice for the Representative's time.
Pre-installation Checklist
Varian 1200/1200L Mass Spectrometer
Power Requirements
The specified electrical supply and power
outlets are available
Gas and Solvent Requirements
There is proper gas equipment
HPLC solvents available
Carrier gases are available
Appropriate lab glassware is available
Nitrogen at 99.999% purity
Argon at 99.999% purity
Air at 99.999% purity
Methane at 99.999% purity
n/a
n/a
n/a
n/a
n/a
n/a

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 1200L LC/MS and is the answer not in the manual?

Questions and answers

Summarization of Contents

General Requirements
Operating Environment
Customer responsible for providing an acceptable operating environment for peak performance.
Temperature and Humidity
Optimal temperature 18-21°C, humidity 40-80%. Avoid extremes.
Particulate Matter
Minimize dust in the lab to prevent insulation and reduce heat transfer.
Vibration
Ensure benches are vibration-free; place foreline pumps on floor.
Exhaust System
Provide adequate exhaust for foreline pump fumes. Consult local regulations.
1200 GC/MS Requirements
Entrance
Ensure passages are at least 36 in. (110 cm) wide for system delivery.
Space and Load Requirements
Details recommended layout, dimensions, and bench weight support for the 1200 GC/MS system.
Power Requirements
Specifies dedicated power sources, voltage, and amperage for the 1200 GC/MS.
Gas Requirements
Details requirements for CI reagent gases and GC carrier gases.
1200L GC/MS Requirements
Entrance
Ensure passages are at least 36 in. (110 cm) wide for system delivery.
Space and Load Requirements
Details recommended layout, dimensions, and bench weight support for the 1200L GC/MS system.
Power Requirements
Specifies dedicated power sources, voltage, and amperage for the 1200L GC/MS.
Gas Requirements
Details requirements for CI reagent gases and GC carrier gases.
1200L LC/MS Requirements
Entrance
Ensure passages are at least 36 in. (91.5 cm) wide for system delivery.
Space and Load Requirements
Details recommended layout, dimensions, and bench weight support for the 1200L LC/MS system.
Power Requirements
Specifies dedicated power sources, voltage, and amperage for the 1200L LC/MS.
Gas Requirements
Details requirements for Nitrogen and Air gas supplies.
Solvent Requirements
Details required solvents and glassware for installation.
1200L GC/LC/MS Requirements
Entrance
Ensure passages are at least 36 in. (91.5 cm) wide for system delivery.
Space and Load Requirements
Details recommended layout, dimensions, and bench weight support for the 1200L GC/LC/MS system.
Power Requirements
Specifies dedicated power sources, voltage, and amperage for the 1200L GC/LC/MS.
Gas Requirements
Details requirements for Nitrogen, Air, and CI reagent gases.
Instrument Arrival and Preparation
Inspection
Inspect shipping cartons for damage upon arrival. Note any issues on delivery documents.
Unpacking and Installation
Varian Field Service Rep will contact for prep, unpack, and demonstrate system.
Spare Parts
List of spare parts available in the Hardware Operation Manual.
Preventive Maintenance
Customer responsibility for routine maintenance to ensure system longevity and performance.