Electrical Connection - Miele PT 7136 Operating And Installation Manual

Vented dryer
Table of Contents

Advertisement

Installation

Electrical connection

This installation should be
performed by an experienced and
qualified technician, in accordance
with local codes and regulations.
The dryer comes with a power cord and
NEMA L6-30 plug.
The machines is supplied for a
connection to a 2 AC 208V 60Hz
2x30A, Single Phase Supply.
For extra safety it is advisable to install
a residual current device (RCD) with a
trip current of 30 mA.
The machine must only be connected
to the voltage and frequency shown on
the data plate.
40

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pt 7138 plus

Table of Contents