INSTRUCTIONS FOR MODELS
SB-1621
(-E, -E15, -BO)
For additional assistance or service please contact:
SPEAKMAN
®
Company
400 Anchor Mill Road
New Castle, DE 19720
800-537-2107
customerservice@speakman.com
www.speakman.com
92-SB-1621-03
3
From below the counter top, install Swivel Tee (1)
over the Inlet Shank of the Spout Assembly. Secure
with Nut (2) and wrench tighten.
6
From below the counter top, secure the Valve End Bodies with the Metal Washers (1), and Mounting Nuts (2).
Wrench Tighten.
TOOLS AND SUPPLIES
Adjustable
Slip Joint
Wrench
Wrench
Supply
Thread Seal
Solder Kit
Hoses
Tape
Tubing
Pipe
Safety
Cutter
Wrench
Glasses
X2
IMPORTANT
Do not over-tighten any connections or damage
may occur.
• Be sure to read instructions thoroughly before
beginning installation.
• This faucet has an operating range of 20-80 psi.
SAFETY TIPS
Cover your drain to prevent loss of parts. Be sure to
wear eye protection while cutting pipe.
MAINTENANCE
Your new Lavatory Faucet is designed for years of
trouble-free performance. Keep it looking new by
cleaning it periodically with a soft cloth. The use of
harsh chemicals and abrasives on any of the
Speakman custom finish products may damage the
finish and void the product warranty. Please be sure
to only use approved cleaners. Please contact
Speakman for any clarification of acceptable
cleaners.
WARRANTY
Additional warranty information can be found at:
www.speakman.com
4
Insert Lift Rod (1), thru the top hole in the Spout
Body (2).
7
Align COLD Handle (1), so the handle is oriented in the OFF position. Lower O-Ring (2) over the Mounting
Flange. Thread Handle Escutcheon (3) onto the COLD Valve End Body (4) while keeping the Handle (1)
stationary. Repeat for the installation of the HOT Handle.
1
From above counter top, lower Spout Assembly
thru center hole.
2
From below the counter top, Secure Spout Body
with the Rubber Washer (1), Metal Washer (2),
and Mounting Nut (3). Wrench tighten.
5
From below the counter top, insert COLD Valve
End Body (2) thru the right hole. Secure Flange
Nut (1) to the Valve End Body (2). Repeat process
for the HOT Valve End Body using the left hole.
Align towards Spout.
X2
X2
Need help?
Do you have a question about the Opera SB-1621 Series and is the answer not in the manual?
Questions and answers