Flowline starter for camera & gimbals w placid stabilizing arm (18 pages)
Summary of Contents for Flycam Flowline Master FLCM-FLN-MSTR-02
Page 1
Flowline Master Professional Support for Camera (FLCM-FLN-MSTR-02) A s s e m b l y M a n u a l What’s In The Box Please inspect the contents of your shipped package to ensure you have received everything that is listed below.
Page 2
NOTE: It is recommended to attach the minimum required weight (4kg / 9lb) for pulling down the balancing rope to ensure proper operation of your Flycam Flowline system. NOTE: Using Placid (FLCM-FLN-PLA) or Edge V1 (FLCM-EDGE-V1) with this Flowline model will impact the minimum and maximum payload capacities.
Page 3
CAUTION: Do Not release the Lever without removing the setup. It may result in serious damage to the camera. YOUR FLYCAM FLOWLINE MASTER PROFESSIONAL SUPPORT FOR ALL DRESSED UP AND READY TO GO (SHOWN WITH OPTIONAL ACCESSORIES) Warranty: We offer a one-year warranty on our products from the date of purchase. During this period, we will repair the product free of charge for labor or parts.
Need help?
Do you have a question about the Flowline Master FLCM-FLN-MSTR-02 and is the answer not in the manual?
Questions and answers