Download Print this page

Flycam Flowline Master Assembly Manual

With pro vest

Advertisement

Quick Links

1
Flowline Master with Pro Vest (FLCM-FLN-MSTR-03)
A s s e m b l y M a n u a l
What's In The Box
Please inspect the contents of your shipped package to ensure you have received everything that is listed
below.
Bag Packing
Flowline Master with Pro Vest
All rights reserved.
No part of this document may be reproduced, stored in a retrieval system, or transmitted by any form or by any means,
electronic, mechanical, photo-copying, recording, or otherwise, except as may be expressly permitted by the applicable copyright
statutes or in writing by the Publisher.

Advertisement

loading
Need help?

Need help?

Do you have a question about the Flowline Master and is the answer not in the manual?

Questions and answers

Summary of Contents for Flycam Flowline Master

  • Page 1 Flowline Master with Pro Vest (FLCM-FLN-MSTR-03) A s s e m b l y M a n u a l What’s In The Box Please inspect the contents of your shipped package to ensure you have received everything that is listed below.
  • Page 2 Flycam Flowline Master Support Bar Camera Hook Side Support Adjustment Release Lever Balance Knob Adjustment Accessory Bag...
  • Page 3 Flycam Flowline Master Setup NOTE: It is recommended to attach the minimum required weight (4kg / 8.81lb)for pulling down the balancing rope to ensure proper operation of your Flycam Flowline system. Support Bar Assembly • Join support bar with body support by push-fit technique.
  • Page 4 Height Adjustable Support Bar Height Adjustable Knobs Side Support Adjustment • Rotate the side support rod 360° for adjust the body support fitment. • Loosen or tighten the side support as per your requirement.
  • Page 5: Camera Mounting

    NOTE: It is recommended to attach the minimum required weight (4kg / 8.81lb) for pulling down the balancing rope to ensure proper operation of your Flycam Flowline system. • Through the balance adjustment Knob, you can adjust the balance anti-clockwise according to the weight of your setup.
  • Page 6 YOUR FLYCAM FLOWLINE MASTER FOR CAMERA GIMBALS ALL DRESSED UP AND READY TO GO! (SHOWN WITH OPTIONAL ACCESSORIES) Warranty: We offer a one-year warranty for our products from the date of purchase. Within this period, we will repair it without charge for labor or parts. The warranty doesn’t cover transportation costs, nor does it cover a product subjected to misuse or accidental damage.

This manual is also suitable for:

Flcm-fln-mstr-03Flowline master flcm-fln-mstr-03