Flowline Starter with Edge V1 Stabilization Arm
(FLCM-FLN-EGV1)
A s s e m b l y M a n u a l
What's In The Box
Please inspect the contents of your shipped package to ensure you have received everything that
is listed below.
2 x Washers
2.5mm Allen Key
2mm Allen Key
2 x Velcro
Flycam Flowline Starter Vest
Edge V1 Arm
Bag Packing
All rights reserved.
No part of this document may be reproduced, stored in a retrieval system, or transmitted by any form or by any means,
electronic, mechanical, photo-copying, recording, or otherwise, except as may be expressly permitted by the applicable copyright
statutes or in writing by the Publisher.

Advertisement

loading
Need help?

Need help?

Do you have a question about the Flowline Starter and is the answer not in the manual?

Questions and answers

Summary of Contents for Flycam Flowline Starter

  • Page 1 Flowline Starter with Edge V1 Stabilization Arm (FLCM-FLN-EGV1) A s s e m b l y M a n u a l What’s In The Box Please inspect the contents of your shipped package to ensure you have received everything that is listed below.
  • Page 2 Features: Support Bar Camera Hook Edge V1 Arm Support Bar Side Support Adjustment Balance Adjustment Knob Flycam Flowline Starter with Edge V1 Arm...
  • Page 3 Flowline Starter with Edge Setup NOTE: It is recommended to attach the minimum required weight (3kg / 6.6lb) for pulling down the balancing rope to ensure proper operation of your Flycam Flowline system. Support Bar Adjustment • Loosen the knob of the Flowline Edge.
  • Page 4 • The Flowline Edge is fully assembled with the Stabilization Arm. The versatile belt system molds to fit all body types. Support Bar Height Adjustment • Loosen all four Adjustment Knobs provided on the back of Support Jacket. • Then adjust the height (upward/downward) of support bar.
  • Page 5: Camera Mounting

    • Put on the support jacket and tighten the buckles provided at the waist and chest. • Then, adjust the jacket as per your convenience. Camera Mounting • Attach the Camera (Not Included) to the hook and tighten using the provided knob to ensure a slip-free connection.
  • Page 6 Adjust Camera Setup Position Spring Tension Adjustment • Loosen the knob at the Edge V1 arm to adjust the spring tension. Feature: The tension adjustment knob allows you to fine-tune the arm's spring tension to your rig's weight, while the adaptable sliding knob adjusts the support rope to meet your unique needs.
  • Page 7 Capture Every Angle (180° Rotation) YOUR FLYCAM FLOWLINE STARTER WITH EDGE V1 STABILIZATION ARM ALL DRESSED UP AND READY TO GO! (SHOWN WITH OPTIONAL ACCESSORIES)
  • Page 8 Warranty: We offer one year warranty for our products from date of purchase. Within this period of time, we will repair it without charge for labor or parts. Warranty doesn’t cover transportation costs nor does it cover a product subjected to misuse or accidental damage. Warranty repairs are subjected to inspection and evaluation by us.

This manual is also suitable for:

Flcm-fln-egv1