Summary of Contents for Flycam Flowline Professional Series
Page 1
Flowline Professional Series (FLCM-FLN-600N|750N) A s s e m b l y M a n u a l What’s In The Box Please inspect the contents of your shipped package to ensure you have received everything that is listed below.
Page 2
Flowline Professional Series Setup NOTE: It is recommended to attach the minimum required weight for pulling down the balancing rope to ensure proper operation of your Flycam Flowline system. Support Arm Assembly • Attach the Support Arm to the Support jacket using a simple push-fit technique.
Page 3
Height Adjustable Support Arm Height Adjustable Knobs Jacket Assembly • Wear the Support Jacket. • Attach both (Left/ Right) padded waist belt with Velcro. • Now, tighten the buckles provided at the waist and chest. • Adjust them to your comfort.
Camera Mounting • Loosen the knob of the Camera Hook. • Push the Camera Hook upwards. • Now, carefully place Camera (Not Included) in the Camera Hook. NOTE: When filming, you might have to manually pull the Camera setup up or down as per your convenience.
Page 5
YOUR FLYCAM FLOWLINE PROFESSIONAL SERIES ALL DRESSED UP AND READY TO GO! (SHOWN WITH OPTIONAL ACCESSORIES) Warranty: We offer a one-year warranty for our products from the date of purchase. Within this period, we will repair it without charge for labor or parts. The warranty doesn’t cover transportation costs, nor does it cover a product subjected to misuse or accidental damage.
This manual is also suitable for:
Flcm-fln-600nFlcm-fln-750nFlowline professional flcm-fln-600nFlowline professional flcm-fln-750n
Need help?
Do you have a question about the Flowline Professional Series and is the answer not in the manual?