Dyness PowerRack LV1 User Manual

Battery system 48v/500ah~900ah

Advertisement

Quick Links

PowerRack LV1
USER MANUAL
Battery System
48V/500Ah~900Ah
File version-20231114-V2-EN Information might be subject to change without notice during product improving.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PowerRack LV1 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Dyness PowerRack LV1

  • Page 1 PowerRack LV1 USER MANUAL Battery System 48V/500Ah~900Ah File version-20231114-V2-EN Information might be subject to change without notice during product improving.
  • Page 2: Table Of Contents

    Product Properties ............................4 Product identity definition ..........................4 2 Product Specification ......................6 System Performance Parameter ....................... 6 Interface Definition ............................8 3 Installation and Configuration ...................9 Preparation for installation .........................9 Equipment installation ..........................13 ©Dyness reserves the copyright of this document.
  • Page 3: Statement Of Law

    The storage, use and disposal of the products shall be carried out in accordance with the product manual, relevant contract or relevant laws and regulations. Customer can check the related information on the website of Dyness Digital Energy Technology Co., LTD. when the product or technology is updated.
  • Page 4: Safety Precautions

    Please charge the battery in 18 hours after it fully discharged or over-discharging protection mode is activated. Formula of theoretical standby time: T=C/I (T is standby time, C is battery capacity, I is total current of all loads). ©Dyness reserves the copyright of this document.
  • Page 5: Preface

    Preface Manual declaration PowerRack LV1 battery energy storage system can provide energy storage function for photovoltaic power generation users. Our product can store extra electricity into battery from photovoltaic power generation system at daytime and supply stable power to user’s equipment as power backup at nighttime or any time when needed.
  • Page 6: Introduction

    B4850 according to their needs, by connecting parallel to form a PowerRack LV1, to meet the user's long-term power supply needs. The product is especially suitable for application scene of high power, limited installation space, long power backup time and long service life.
  • Page 7 After the battery life is terminated, the battery can continue to be used after it recycled by the professional recycling organization and do not discard it at will. ©Dyness reserves the copyright of this document.
  • Page 8: Product Specification

    PowerRack LV1 User Manual 2 Product Specification System Performance Parameter Table 2-1 The parameter of PowerRack LV1 system -1 PowerRack PowerRack PowerRack PowerRack PowerRack PowerRack Item LV1-5P LV1-6P LV1-7P LV1-8P LV1-9P LV1-10P Module Type Nominal Voltage(V) Work Voltage 42~54 42~54...
  • Page 9 Current(A) Dimension 601*510*1917 601*510*1917 601*510*1917 601*510*1917 601*510*1917 601*510*1917 (mm) Weight(kg) 365.5 388.5 411.5 434.5 457.5 480.5 Battery Module B4850 B4850 B4850 B4850 B4850 B4850 Name Battery Module Quantity(pcs) Figure 2-1 PowerRack LV1 -16P ©Dyness reserves the copyright of this document.
  • Page 10: Interface Definition

    Green light flashing during standby and charging mode. Green light always on when discharging. Communication cascade port, support CAN/ RS485 CAN/485 communication (factory default CAN communication) DRY CONTACT DIP switch ©Dyness reserves the copyright of this document.
  • Page 11: Installation And Configuration

    The optimal ambient temperature is 15 C~ 30  Keep away from dust and messy zones.  The installation site must be equipped with fire-extinguisher system for safety purpose.  Tools and data ©Dyness reserves the copyright of this document.
  • Page 12 Firefighting equipment should be provided near the product, such as portable dry  powder fire extinguisher. Automatic fire fighting system shall be provided for the case where necessary.  No flammable, explosive and other dangerous materials are placed beside the battery.  Unpacking inspection ©Dyness reserves the copyright of this document.
  • Page 13 Packing list of PowerRack LV1-12P is as follows: Item Specification...
  • Page 14 Mounting space and bearing capacity.  Make sure that the battery has enough room to install, and that the battery rack and  bracket have enough load capacity. Wiring.  ©Dyness reserves the copyright of this document.
  • Page 15: Equipment Installation

    2. Prepare equipment and tools for installation. 3. Check the B4850 unit and confirm that the ON/OFF switch is in the "OFF" state to ensure the device is shut off. Mechanical installation Installation method: ©Dyness reserves the copyright of this document.
  • Page 16 3. Insert the second one B4850 in to the rack. Figure 3-5 4. Stack the required number of battery as described above, and use 4 screws to fix the battery on the front bracket. Shown as Figure 3-6. ©Dyness reserves the copyright of this document.
  • Page 17 Note:After visual testing of parallel cable connection, the positive and negative cable of the power shall be connected respectively to the positive and negative busbar of the opposite terminal. It is better to add a circuit breaker between the inverter and the battery system. ©Dyness reserves the copyright of this document.
  • Page 18 Max.work current more than 120A,please add power cable according to the proportion. Note: For more information of matching inverter brands, please subject to the latest document <The list of compatibility between Dyness ESS and Inverters >. Battery parameter settings on the inverter Max Charging(Bulk) Voltage: 53.5V...
  • Page 19 After the battery system installation is completed and the running is normal, you need to log in to the DYNESS official website to register the product installation and use information to make the product warranty effective. Please follow the instructions on the website to register.
  • Page 20 Address: No. 511 Chenzhuang West Road, Sanshui Street, Jiangyan District, Taizhou City Email: service@dyness-tech.com Tel: +86 400 666 0655 Web: www.dyness.com Official Website Digital version access...

Table of Contents