1.4.1.2 Installation Steps
1. Attach the connection plate and the front connection plate to each side of the power supplies
using twenty-four Pan Head screws and Twenty-four Rip-Lock washer M5 as illustrated in Figure
1.
Figure 1: Four G7.5kW 20-40V Units — Connection Plates 4U Assembly
Connection Plate 4U (x2)
Rip-Lock Washer M5, BN 84530 (x24)
10-32 x 0.3125 Pan Head Screw (x24)
Tightening torque: 25.4-31.7 Lbf-inch (2.87-3.58Nm).
Front Connection Plate 4U (x2)
3
Need help?
Do you have a question about the GENESYS Series and is the answer not in the manual?