Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany • www.huck.net seiltechnik@huck.net 1 Introduction Assembling General information This equipment should be installed, inspected, maintained and operated in accordance with EN1176-7 guidelines. Before installation work commences, please check that you have all of the equipment and fixation components in the parts list provided (see Tables 3-1 and 3-2).
Page 5
Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany • www.huck.net seiltechnik@huck.net Drawings / Views All optical drawings are showing only the measurements/dimensions and are no mandatory technical views of the complete item. We reserve the right to change technical details of our articles which are serving for the further development of our articles and are reasonable for the customer.
Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany • www.huck.net seiltechnik@huck.net Datasheet Climbing Garden swing, article # 4587-21 Component zone: 6,10 m x 3,80 m Safety zone: 8,30 m x 7,50 m Height of fall: 2,35 m Total ground height: 2,30 m Fall protection area: 46 m²...
Page 7
Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany • www.huck.net seiltechnik@huck.net Round off foundation edges (min.R = 100 mm)! Sizes of fundations are “4-5” (natural ground). Soil class 4: soft to medium plasticity, interleave bound, with minor portion of stone (portion <...
Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany • www.huck.net seiltechnik@huck.net Delivery contents (parts list with part numbers) In words Table 3-1: Delivery contents, in words Pos. Quantity Element / Size Missing Description Steel posts 1.50 m long, Ø 102 Corner tubes For Ø...
Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany • www.huck.net seiltechnik@huck.net Post installation checks If the equipment has not been installed safely, you must ensure that the public is prevented from using it. Marking filler depth • Labelling the posts to show the depth of material provided as fall protection (i.e. loose filler).
Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany • www.huck.net seiltechnik@huck.net Introduction Maintenance General informations This equipment should be installed, inspected, maintained and operated in accordance with EN 1176-7 guidelines. Please note: Providing any necessary repairs are carried out, a piece of play equipment that is inspected regularly cannot become so damaged that it is dangerous.
Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany • www.huck.net seiltechnik@huck.net General maintenance information Maintenance intervals Maintenance intervals are based on average use. Please note that more frequent inspections and/or maintenance are required if the play equipment is subject to intensive use.
Page 43
Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany • www.huck.net seiltechnik@huck.net Faults Damages must be repaired as soon as they are detected. If serious defects that affect the safetyness cannot be repaired straight away, the playground item must be blocked with immediate effect.
Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany • www.huck.net seiltechnik@huck.net Maintenance timetable Special advices 8.1.1 Maintenance interval We strongly advise you to carry out inspections and maintenance work within the specified periods as use of the equipment, the weather and malicious vandalism cause wear and tear that compromises the safety and function of the equipment.
Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany • www.huck.net seiltechnik@huck.net 10 Monthly maintenance 10.1 Check the spaces between the equipment and the ground (clearance and height of fall). 10.2 Check the ground surface of fall protection for hard objects and loose foundations.
Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany • www.huck.net seiltechnik@huck.net Annual Maintenance Annual maintenance 13.1 Ascertaining that the equipment, foundations and surfaces are safe for operation. 13.2 In particular, the equipment should be checked for decay and corrosion. It may be necessary to dig out or excavate certain components in order to do so.
Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany • www.huck.net seiltechnik@huck.net 15 Hand over document After the installation of the equipment pass the installation and maintenance documents to the operator. The operator has to receive the hand over documents. The complete filled and signed hand over document should be sent to the supplier.
Need help?
Do you have a question about the 4587-21 and is the answer not in the manual?
Questions and answers