HUCK Seiltechnik GmbH • Dillerberg 3 • 35614 Asslar-Berghausen seiltechnik@huck.net • www.huck.net Assembly instruction Easy – Climb 4 Part no. 4591-40-4 Operator: ______________________________________________________ Location: ______________________________________________________ Attention! The distance between the center of the poles is 2.25m. In case of an eventual add-on of any other rope-parcours elements (e.g.
HUCK Seiltechnik GmbH • Dillerberg 3 • 35614 Asslar-Berghausen seiltechnik@huck.net • www.huck.net Introduction installation General information This equipment should be installed, inspected, maintained and operated in ac- cordance with EN1176-7 guidelines. Before installation work commences, please check that you have all of the equipment and fixation components in the parts list provided (see tables 3-1 and 3-2).
Page 5
HUCK Seiltechnik GmbH • Dillerberg 3 • 35614 Asslar-Berghausen seiltechnik@huck.net • www.huck.net Data sheet Easy – Climb 4 part no. 4591-40-4 Space required without safety area: 2,35 m x 2,20 m Space required including safety zone: 4,70 m x 4,60 m Height of fall: max.
Page 6
HUCK Seiltechnik GmbH • Dillerberg 3 • 35614 Asslar-Berghausen seiltechnik@huck.net • www.huck.net Any spare parts that may be required can be directly obtained from your supplier or Huck Seil- technik GmbH Address: Huck Seiltechnik GmbH Dillerberg 3 D-35614 Aßlar/Berghausen Phone +49 (0)6443 / 8311-0...
Page 7
HUCK Seiltechnik GmbH • Dillerberg 3 • 35614 Asslar-Berghausen seiltechnik@huck.net • www.huck.net Drawings / views All optical illustrations simply demonstrate the propor- tions/dimensions to be followed, but are not binding, technical equipment images. Technical modifications supporting the advancement of our ar- ticles are subject to change.
HUCK Seiltechnik GmbH • Dillerberg 3 • 35614 Asslar-Berghausen seiltechnik@huck.net • www.huck.net Scope of supply, parts list with part numbers in letters (attention – number of items refer to 1 unit!!) Table 3-1: Scope of suppply, parts list with part numbers Pos.
Page 9
HUCK Seiltechnik GmbH • Dillerberg 3 • 35614 Asslar-Berghausen seiltechnik@huck.net • www.huck.net as symbols Table 3-2: Scope of supply, parts list with part numbers Pos. Num- Symbol ber of items Ø 102 mm - 2 ,40 m long for Ø 102 mm for Ø...
Page 14
HUCK Seiltechnik GmbH • Dillerberg 3 • 35614 Asslar-Berghausen seiltechnik@huck.net • www.huck.net EASY – Climb 1, part no. 4591- 40-4 Explanation to abbreviations and signs: Setting time for concrete C25/30 minimum 7-8 days Dimension between axes of posts (center-center) Clear post dimension...
HUCK Seiltechnik GmbH • Dillerberg 3 • 35614 Asslar-Berghausen seiltechnik@huck.net • www.huck.net Examination after installation If the equipment is not installed in a secure manner you must ensure that access is closed to the public! Marking the filling level • Markings on the equipment to indicate filling levels of fall protection material (for example of loose filling material).
HUCK Seiltechnik GmbH • Dillerberg 3 • 35614 Asslar-Berghausen seiltechnik@huck.net • www.huck.net Introduction maintenance General information This equipment should be installed, inspected, maintained and operated in ac- cordance with EN1176-7 guidelines. Please note: Providing any necessary repairs are carried out, a piece of play equipment that is inspected regularly cannot become so damaged that it is dangerous.
HUCK Seiltechnik GmbH • Dillerberg 3 • 35614 Asslar-Berghausen seiltechnik@huck.net • www.huck.net General maintenance information Maintenance intervals Maintenance intervals are based on average use. Please note that more fre- quent inspections and/or maintenance are required if the play equipment is...
Page 21
HUCK Seiltechnik GmbH • Dillerberg 3 • 35614 Asslar-Berghausen seiltechnik@huck.net • www.huck.net Faults Damages must be repaired as soon as they are detected. If serious de- fects that affect the safetyness cannot be repaired straight away, the playground equipment must be closed to the public with immediate effect.
HUCK Seiltechnik GmbH • Dillerberg 3 • 35614 Asslar-Berghausen seiltechnik@huck.net • www.huck.net Maintenance timetable Special advices 8.1.1 Maintenance interval We strongly advise to carry out inspections and maintenance work within the specified periods as use of the equipment, weather and malicious vandalism cause wear and tear that compromise safety and function of the equipment.
HUCK Seiltechnik GmbH • Dillerberg 3 • 35614 Asslar-Berghausen seiltechnik@huck.net • www.huck.net Monthly maintenance (text) 10.1 Check the spaces between the equipment and the ground (clearance and height of fall). 10.2 Check the ground surface of fall protection for hard objects and loose foundations.
HUCK Seiltechnik GmbH • Dillerberg 3 • 35614 Asslar-Berghausen seiltechnik@huck.net • www.huck.net Annual maintenance – main inspection Annual main inspection (text) 13.1 The complete equipment as well as the foundations and the surfaces are to be checked if they are generally safe.
The operator has to have the documents signed. The complete filled and signed hand over documents are to be sent back to the supplier Huck Seiltechnik GmbH via fax +49 (0)6443 / 83 11 79! Part no.:...