HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net 1 Introduction installation General information This equipment should be installed, inspected, maintained and operated in accordance with EN1176-7 guidelines. Before installation work commences, please check that you have all of the equipment and fixation components in the parts list provided (see Tables 3-1 and 3-2).
Page 5
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net Drawings / views All optical illustrations simply demonstrate the proporti- ons/dimensions to be followed, but are not binding, technical equipment images. Technical modifications supporting the advancement of our articles are subject to change.
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net Data sheet “Swing Bed“ Easy- Swing Art.-Nr. 4591-50-9 Space requirement: 2650 x 2600 mm safety zone:: 7050 x 2250 mm Height of equipment: 2450 mm Height of Fall:...
Page 7
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net Required accessories: Small excavator, ladder of about 2m length baromet- ric level, water balance, various drills (Ø11, Ø13, Ø17), various wrenches resp. Allen wrenches, compactor (Frosch), screw driver.
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net 3 Scope of supply, parts list with part numbers in letters Table 3-1: Scope of supply, parts list with part numbers Pos. Quantity Element / Size O.K. Missing description Ø102 mm...
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net in symbols Table 3-2: Scope of supply, parts list with part numbers Pos. Quantity Symbol Ø102 mm / lg. 3400 mm Ø102 mm Ø102 mm Ø102 mm / M10 x 150 mm 900 x 1350 mm \\CAD1\Standard\4591-50-9\Montageanleitung\Easy_Swing_Schaukelbett_4591_50_9_ST_B_L_1_GBR.doc...
Page 10
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net M10 x 35 mm 5,5 x 25 mm 3 ml Ca. 300 x 300 mm (on-site customer) \\CAD1\Standard\4591-50-9\Montageanleitung\Easy_Swing_Schaukelbett_4591_50_9_ST_B_L_1_GBR.doc...
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net 4 Abbreviations The legally prescribed setting times must be observed! AUM!! If necessary, adjust the suspension height to the dimension 400 mm! C25/30 concrete (for foundations) Detail Fall protection...
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net 6 Examination after installation If the equipment is not installed in a secure manner you must ensure that access is closed to the public! Marking the filling level ( +/- 0,00m ) Markings on the equipment to indicate filling levels of fall protection material (for example of loose filling material).
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net 7 Introduction maintenance General information his equipment should be installed, inspected, maintained and operated in ac- cordance with EN 1176-7 guidelines. Please note: Providing any necessary repairs are carried out, a piece of play equipment that is inspected regularly cannot become so damaged that it is dangerous.
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net 8 General maintenance information Maintenance intervals Maintenance intervals are based on average use. Please note that more fre- quent inspections and/or maintenance are required if the play equipment is...
Page 25
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net Faults Damages must be repaired as soon as they are detected! If serious de- fects that affect the safety cannot be repaired straight away, the play- ground equipment must be closed to the public with immediate effect.
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net 9 Maintenance timetable Special advices 9.1.1 Maintenance interval We strongly advise to carry out inspections and maintenance work within the specified periods as use of the equipment, weather and malicious vandalism cause wear and tear that compromise safety and function of the equipment.
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net 11 Monthly maintenance 11.1 Check the spaces between the equipment and the ground (clearance and height of fall). 11.2 Check the ground surface of fall protection for hard objects and loose foundations.
The equipment must be inspected by someone with the necessary exper- tise in strict compliance with the instructions issued by Huck Seiltechnik GmbH. A copy of the inspection record is to be given to the operator, who must confirm receipt! \\CAD1\Standard\4591-50-9\Montageanleitung\Easy_Swing_Schaukelbett_4591_50_9_ST_B_L_1_GBR.doc...
The operator has to have the documents signed. The complete filled and signed hand over documents are to be sent back to the supplier Huck Seiltechnik GmbH via fax +49 (0)6443 / 83 11 79! Part no.:...
Need help?
Do you have a question about the Swing Bed 4591-50-9 and is the answer not in the manual?
Questions and answers