HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net Introduction Assembly General Information This equipment should be installed, inspected, maintained and operated in accordance with EN1176-7 guidelines. Before installation work commences, please check that you have all of the equipment and fixation components in the parts list provided (see tables 3-1 and 3-2).
Page 5
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net Drawings / Views All optical drawings are showing only the measurements/dimensions and are not mandatory technical views of the complete items. We reserve the right to change technical details of our articles which are serving for the further development of our articles and are reasonable for the customer.
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net Datasheet: Midi Cheops Pyramid Art. 4587-22 Space requirement: Ø 8.15m and/or Ø 11.20m including safety zone, height of fall 1.40m Required Safety Surface: Surface Material Description Minimum Maximum Height...
Page 7
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net Any spare parts which may be required can be obtained directly from your supplier. We hereby confirm that this item of play equipment has been tested and certified in accordance with the play equipment standard EN1176.
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net Delivery Contents (parts list with part numbers) in Words Table 3-1: Delivery Contents, in words Missing Pos. Quantity Element / Size O.K. Description Steel Posts, Galvanised Ø 102 mm, 5.00 m...
Page 9
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net In Symbols Table 3-1: Delivery Contents, in symbols Pos. Symbol Size Quantity Steel mast Ø 102 mm, 5.00 m long for 102 mm Steel Mast Headstock Ø 360 mm...
Page 10
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net Pos. Symbol Size Quantity 5,5 x 25 mm Self Tapping Screw U- Disc für Ø 101,6 mm Clamp für Ø 101,6 mm Clamp with Thread Ground Anchor Paint Brush and Roller Blue Paint (ca.
Page 16
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net Symbols and abreviations: Setting time 7-8 days C25/30 for foundation Required Concrete:1,6 m Detail View Fall Protection Drainage Layer 10 cm Gehw. Pl. Provided by Customer Ground Level Space Requirements including safety surfacing ~32,45 m Round off foundation edges (min.R = 100mm) sizes of...
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net Post Installation Checks If the equipment has not been installed safely, you must ensure that the public is prevented from using it. Marking Filler Depth • Labelling the posts to show the depth of material provided as fall protection (i.e.
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net Introduction Maintenance General Information This equipment should be installed, inspected, maintaned and operated in accordance with EN1176-7 guideline. Please Note: Providing any necessary repairs are carried out, a piece of play equipment that is inspected regularly cannot become so damaged it is dangerous.
Page 20
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net General Maintenance Information Maintenance Intervals Maintenance intervals are based on average use. Please note that more frequent inspections and/or maintenance are required if the play equipment is subject to intensive use.
Page 21
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net Faults Damages must be repaired as soon as they are detected if serious defects that affect the safetyness cannot be repaired straight away, the playground item must be blocked with immediate effect.
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net Maintenance Timetable Special Advices Maintenance Interval We strongly advise you carry out inspections and maintenance work within the specified periods as use of the equipment, the weather and malicious vandalism cause wear and tear that compromises the safety and function of the equipment.
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net Monthly Maintenance • 10.1 Check the spaces between the equipment and the ground (clearance and height of fall). • 10.2 Check the ground surface of fall protection for hard objects and loose foundations.
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net Half Yearly Maintenance • 12.1 The stablity of supporting posts, supports, foundations etc. Has to be checked. The safety level of the entire system has to be checked after repairs have been carried out or additional system components have been installed or replaced.
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net Hand Over Document After the installation of the equipment pass the installation and maintenance documents to the operator. The operator has to receive the hand over documents. The complete filled and signed hand over document should be sent to the supplier.
Need help?
Do you have a question about the Midi Climbing Teepee and is the answer not in the manual?
Questions and answers