Installation Instructions
Midi Climbing Teepee
Art No.4587-22
Operator: ___________________________________________________________
Location: ___________________________________________________________
Voglnestbaum Mini 4652-30
- 1 -

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Midi Climbing Teepee and is the answer not in the manual?

Questions and answers

Summary of Contents for HUCK Seiltechnik Midi Climbing Teepee

  • Page 1 HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net Installation Instructions Midi Climbing Teepee Art No.4587-22 Operator: ___________________________________________________________ Location: ___________________________________________________________ Voglnestbaum Mini 4652-30 - 1 -...
  • Page 2 HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net Revisionshistorie Revision 0 – 2012-07-09 Erste freigegebene Version FH Montageanleitung Revision 0 Alle Rechte vorbehalten © Copyright 2012 Huck Seiltechnik GmbH Dokument1 - 2 - Voglnestbaum Mini 4652-30 Vogelnestb...
  • Page 3: Table Of Contents

    HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net Contents: Assembly Instructions ........................1 Introduction Assembly........................4 Data Sheet ............................6 Delivery Contents (parts list with description) ................8 Erection Instructions ........................10 Post Installation Checks ......................16 Maintenance Instructions ......................
  • Page 4: Introduction Assembly

    HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net Introduction Assembly General Information This equipment should be installed, inspected, maintained and operated in accordance with EN1176-7 guidelines. Before installation work commences, please check that you have all of the equipment and fixation components in the parts list provided (see tables 3-1 and 3-2).
  • Page 5 HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net Drawings / Views All optical drawings are showing only the measurements/dimensions and are not mandatory technical views of the complete items. We reserve the right to change technical details of our articles which are serving for the further development of our articles and are reasonable for the customer.
  • Page 6: Data Sheet

    HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net Datasheet: Midi Cheops Pyramid Art. 4587-22 Space requirement: Ø 8.15m and/or Ø 11.20m including safety zone, height of fall 1.40m Required Safety Surface: Surface Material Description Minimum Maximum Height...
  • Page 7 HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net Any spare parts which may be required can be obtained directly from your supplier. We hereby confirm that this item of play equipment has been tested and certified in accordance with the play equipment standard EN1176.
  • Page 8: Table 3-1: Delivery Contents, In Words

    HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net Delivery Contents (parts list with part numbers) in Words Table 3-1: Delivery Contents, in words Missing Pos. Quantity Element / Size O.K. Description Steel Posts, Galvanised Ø 102 mm, 5.00 m...
  • Page 9 HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net In Symbols Table 3-1: Delivery Contents, in symbols Pos. Symbol Size Quantity Steel mast Ø 102 mm, 5.00 m long for 102 mm Steel Mast Headstock Ø 360 mm...
  • Page 10 HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net Pos. Symbol Size Quantity 5,5 x 25 mm Self Tapping Screw U- Disc für Ø 101,6 mm Clamp für Ø 101,6 mm Clamp with Thread Ground Anchor Paint Brush and Roller Blue Paint (ca.
  • Page 11: Erection Instructions

    HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net Erection Instructions Voglnestbaum Mini 4652-30 - 11 -...
  • Page 12 HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net - 12 - Voglnestbaum Mini 4652-30 Vogelnestb...
  • Page 13 HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net Voglnestbaum Mini 4652-30 - 13 -...
  • Page 14 HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net - 14 - Voglnestbaum Mini 4652-30 Vogelnestb...
  • Page 15 HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net Voglnestbaum Mini 4652-30 - 15 -...
  • Page 16 HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net Symbols and abreviations: Setting time 7-8 days C25/30 for foundation Required Concrete:1,6 m Detail View Fall Protection Drainage Layer 10 cm Gehw. Pl. Provided by Customer Ground Level Space Requirements including safety surfacing ~32,45 m Round off foundation edges (min.R = 100mm) sizes of...
  • Page 17: Post Installation Checks

    HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net Post Installation Checks If the equipment has not been installed safely, you must ensure that the public is prevented from using it. Marking Filler Depth • Labelling the posts to show the depth of material provided as fall protection (i.e.
  • Page 18: B Maintenance Instructions

    HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net Maintenance Instructions Midi Climbing Teepee Art. 4587-23 - 18 - Voglnestbaum Mini 4652-30 Vogelnestb...
  • Page 19: Introduction Maintenance

    HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net Introduction Maintenance General Information This equipment should be installed, inspected, maintaned and operated in accordance with EN1176-7 guideline. Please Note: Providing any necessary repairs are carried out, a piece of play equipment that is inspected regularly cannot become so damaged it is dangerous.
  • Page 20 HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net General Maintenance Information Maintenance Intervals Maintenance intervals are based on average use. Please note that more frequent inspections and/or maintenance are required if the play equipment is subject to intensive use.
  • Page 21 HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net Faults Damages must be repaired as soon as they are detected if serious defects that affect the safetyness cannot be repaired straight away, the playground item must be blocked with immediate effect.
  • Page 22: Maintenance Timetable

    HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net Maintenance Timetable Special Advices Maintenance Interval We strongly advise you carry out inspections and maintenance work within the specified periods as use of the equipment, the weather and malicious vandalism cause wear and tear that compromises the safety and function of the equipment.
  • Page 23: Maintenance Illustration

    HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net Maintenance (Illustration) Voglnestbaum Mini 4652-30 - 23 -...
  • Page 24: Monthly Maintenance

    HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net Monthly Maintenance • 10.1 Check the spaces between the equipment and the ground (clearance and height of fall). • 10.2 Check the ground surface of fall protection for hard objects and loose foundations.
  • Page 25: Half Year Maintenance

    HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net Half Yearly Maintenance • 12.1 The stablity of supporting posts, supports, foundations etc. Has to be checked. The safety level of the entire system has to be checked after repairs have been carried out or additional system components have been installed or replaced.
  • Page 27: Maintenance Printout

    HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net Maintenance Printout Name of Item: Midi Climbing Teepee _______________ / Art. 4587-22 _______________________________________ Location: _______________________________________________________________________________________ Customer or Operator: _____________________________________________________________________________ (Local Authority, Schools) Date of Inspector O.K. Accessible Barriered...
  • Page 29: Handover Document

    HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net - www.huck.net Hand Over Document After the installation of the equipment pass the installation and maintenance documents to the operator. The operator has to receive the hand over documents. The complete filled and signed hand over document should be sent to the supplier.