13. Restart the replacement node.
14. Verify Ethernet connectivity between the replacement node and the
existing cluster nodes. Run the ping utility from the replacement node,
pinging the client LAN adapters on all other nodes. If Ethernet is used
as the cluster interconnect, ping the cluster interconnect adapters of all
other nodes.
15. Verify that the replacement node can access the shared storage. From
the replacement node, start Disk Management to verify that the same
shared disk resources are seen from this node as they are from other
installed nodes in the cluster.
Installing the Cluster Software
Now that the replacment node is configured and physically connected to the
cluster, the next procedure is to integrate the node into the cluster. This
involves installing the low-level cluster management software and the OSDs.
It also involves installing the application-level cluster software, including
Oracle8i Server with the Oracle8i Parallel Server Option.
All activities in this procedure are facilitated with the Oracle Universal
Installer (OUI). The installation is further simplified in that almost all steps are
performed from a single server, the primary cluster node.
To replace a cluster node, you must disassemble the existing cluster and then
reform it to include the replacement node.
1. If the replacement node is not the node on which you originally
installed the OSDs, do the following on all original cluster nodes (not
the replacement node):
a. Shut down the Oracle instance.
b. Stop all Oracle services.
c. On the node that was originally used to install the OSDs, use the
OUI to deinstall the OSDs.
d. Restart all nodes to complete the deinstallation process.
Cluster Management 6-23