Connect a cable from Fibre Channel switch 0 (sw0) to the second
d
front-end fibre channel port on SP-B.
Connect a cable from Fibre Channel switch 1 (sw1) to the third front-
e
end fibre channel port on SP-A.
Connect a cable from Fibre Channel switch 1 (sw1) to the third front-
f
end fibre channel port on SP-B.
Connect a cable from Fibre Channel switch 1 (sw1) to the fourth
g
front-end fibre channel port on SP-A.
Connect a cable from Fibre Channel switch 1 (sw1) to the fourth
h
front-end fibre channel port on SP-B.
NOTE:
Additional cables can be connected from the fibre channel switches to the
storage system if there are available front-end fibre channel ports on the storage
processors.
Figure 2-11. Cabling a SAN-Attached Cluster to the Dell/EMC CX4-480
cluster node 1
HBA ports (2)
0 1
sw0
SP-B
CX4-480 storage system
Cabling Your Cluster Hardware
cluster node 2
HBA ports (2)
SP-A
0 1
sw1
31