Introduction
1.3.2 Breaking in a New Machine
Your machine has been well adjusted and tested before delivery, but the initial operation on the
machine in severe conditions will seriously affect the performance or reduce the service life of the
machine. Thus Sany recommends you to perform 100-hour test run before putting the machine in-
to production use.
During the test run:
•
Preheat the machine before performing any operations.
•
Avoid operating or running the machine at a high speed in overload working conditions.
•
Avoid sudden starting, rapid movement or abrupt stop of the machine.
•
Cool down the machine system at the end of every working day.
1.3.3 Machine Information
The factory numbers (serial numbers) and models on the nameplate are important information re-
quired for ordering replacement parts or requiring assistance for your machine. So please write
down the related information in this manual for further use
Information" on page
The nameplate is riveted on the left side of the front frame, see below figure.
Fig 1-3
1-6
1-7).
Safety, Operation and Maintenance Manual-March 2021
STG230C-8S Motor Grader
(see:"Serial Number and Distributor
Need help?
Do you have a question about the STG230C-8S and is the answer not in the manual?