Advertisement

Quick Links

Diamond Series
User Manual
Version: 3.6
Updated: 2021-8-17

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Diamond Series and is the answer not in the manual?

Questions and answers

Summary of Contents for ROE Diamond Series

  • Page 1 Diamond Series User Manual Version: 3.6 Updated: 2021-8-17...
  • Page 2: Warranty Policy

    (cigarette, fireworks, or other), unauthorized modification, or failure to follow instructions supplied with the product. (2) Repair or attempted repair by anyone other than ROE Visual, a ROE certified repair center, or a ROE certified engineer.
  • Page 3: Contact Information

    (12) Software or accessory malfunction. (13) Any other cause not related to a defect in materials or workmanship. Contact Information If you have any questions about this document, please feel free to contact with ROE technical service team. ROE China...
  • Page 4: Table Of Contents

    Package ..........................25 Flight Case ........................25 Installation Overview ......................27 Quick-start Guide ........................28 Hanging System ......................28 Stacking System ......................31 Ballast Calculation ......................35 2020-11-23 | Copyright © 2020 ROE Visual Co., Ltd. All Rights Reserved. 4 / 46...
  • Page 5 Replacing the Power Unit ....................44 11.6 Replacing the Receiving Card ..................45 11.7 Replacing the Tile Handle ....................46 11.8 Replacing the Module Handle..................46 Revision History ....................... 47 2020-11-23 | Copyright © 2020 ROE Visual Co., Ltd. All Rights Reserved. 5 / 46...
  • Page 6: Safety

    All components should be kept dry, clean, lubricated (only of recommended), coated properly, and otherwise maintained in a manner consistent with the part design. ROE products must be used in a manner consistent with their design and inspected on a routine basis for security, wear, deformation, corrosion and any other circumstances that may affect the loading capacity.
  • Page 7 LED when the LED heats up too aggressively. There fore,ROE recommends that if you have not used a screen for a prolonged time and/or the screen was stored in a very humid environment,you slowly heat up the screen.
  • Page 8: Safety Instructions

    (9) Please do not use the product near the sea and / or other places with corrosive environment. (10) The installation must be performed by authorized and qualified technical personnel only. 2020-11-23 | Copyright © 2020 ROE Visual Co., Ltd. All Rights Reserved. 8 / 46...
  • Page 9: Consignes De Sécurité

    Les produits ROE doivent être utilisés conformément à leur conception et inspectés régulièrement pour vérifier leur sécurité, leur usure, leur déformation, leur corrosion et toute autre circonstance pouvant affecter leur capacité...
  • Page 10 LED contient de l'humidité, il y a un risque d'endommager la LED lorsque la LED chauffe de manière trop agressive. Par conséquent, ROE recommande que si vous n'avez pas utilisé un écran pendant une période prolongée et / ou que l'écran a été stocké dans un environnement très humide, vous chauffez lentement l'écran.
  • Page 11: Consignes De Sécurité

    (9) Veuillez ne pas utiliser le produit près de la mer et / ou d’autres lieux exposés à un environnement corrosif. (10) L'installation doit être effectuée par du personnel technique autorisé et qualifié. 2020-11-23 | Copyright © 2020 ROE Visual Co., Ltd. All Rights Reserved. 11 / 46...
  • Page 12: General Introduction

    Diamond Series is the ideal cost-effective LED display solution for rental, stage and fixed applications. There are DM2.6 and DM3.9 at present. 2.1.1 Ultra-lightweight The Diamond Series is 500 x 500 mm, but it’s 5.76 kg per tile. The lightweight magnesium alloy frame ensures the extreme durability. 2.1.2 Superb Visual The sleek design with black LEDs highlights its high contrast and brightness for a vivid visual effect.
  • Page 13: Specifications

    -40 ° C to 60 ° C / -40 ° F to 140 ° F Storage Temperature Humidity 10 – 90% RH Certifications CE, ETL, TUV Max BTU AVG BTU 2020-11-23 | Copyright © 2020 ROE Visual Co., Ltd. All Rights Reserved. 13 / 46...
  • Page 14: Installation Requirements

    Weight Do not underestimate the weight of tiles and frames. Please make sure the floor or truss on which ROE tiles and frames will be installed is capable of handling five times the complete weight of tiles and frames. Do not forget to take into consideration the ballast weight required by the stacking system.
  • Page 15: Components

    Figure 4-1. DM Series Components Power-in Data Locating Pin Safety Lock Module Handle Power Box Tile Handle Indicator Test Button Power-out Data Figure 4-2. DM Series Parts Information 2020-11-23 | Copyright © 2020 ROE Visual Co., Ltd. All Rights Reserved. 15 / 46...
  • Page 16: Module

    Dimensions: 250 x 250 mm Figure 4-3. DM Series Module Dimensions Power Box Dimensions: 75 x 390 x 45 mm Figure 4-4. DM Series Power Box Dimensions 2020-11-23 | Copyright © 2020 ROE Visual Co., Ltd. All Rights Reserved. 16 / 46...
  • Page 17: Accessories

    Weight: 5.2±3% kg Dimensions: 493 x 80 x60 mm DM hanging bar, 2W, shackle, V1.1 SAP: 304010-00276 Weight: 8.6±3% kg Dimensions: 993 x 80 x 60mm 2020-11-23 | Copyright © 2020 ROE Visual Co., Ltd. All Rights Reserved. 17 / 46...
  • Page 18: For Stacking

    Weight: 1±3% kg Dimensions: 232 x 106.5 x 50 mm DM stacking rear adapter, V1.0 SAP: 304012-01857 Weight: 0.45 kg Dimensions: 112 x 76.3 x 92 mm 2020-11-23 | Copyright © 2020 ROE Visual Co., Ltd. All Rights Reserved. 18 / 46...
  • Page 19: A Complete Stacking System

    Note: The stacking system should be used every two-tile wide at least and it will be better to be used every one-tile wide when necessary. 2020-11-23 | Copyright © 2020 ROE Visual Co., Ltd. All Rights Reserved. 19 / 46...
  • Page 20: Locking Plate & Curving Plate

    How to Calculate How Many Locking Plates You Need Hanging Stacking Project: m (W) x n (H) 4-way Locking Plate: (m-1) x n 2-way Locking Plate: 2 x n + m - 1 2020-11-23 | Copyright © 2020 ROE Visual Co., Ltd. All Rights Reserved. 20 / 46...
  • Page 21: Cables

    Neutrik _ Neutrik Connectors Connect the processor and tiles. Data cable, 0.4m, etherCON- etherCON, V3.0 SAP: 208004S0685 Weight: 0.08 kg Neutri _ Neutrik Connectors Connect neighboring tiles (vertical). 2020-11-23 | Copyright © 2020 ROE Visual Co., Ltd. All Rights Reserved. 21 / 46...
  • Page 22 “click”. Pull back the button on the plug, turn the power cable anti-clockwise and plug it out. 2020-11-23 | Copyright © 2020 ROE Visual Co., Ltd. All Rights Reserved. 22 / 46...
  • Page 23 5.5.3 Data Cable Plug in the data cable and you feel a “click”. Press the button on the socket and plug the data cable out. 2020-11-23 | Copyright © 2020 ROE Visual Co., Ltd. All Rights Reserved. 23 / 46...
  • Page 24: Package

    Figure 6-2. Optional DM Series Flight Case Dimensions Note: The left space in the middle of the flight case is designed for cables and / or accessories. 2020-11-23 | Copyright © 2020 ROE Visual Co., Ltd. All Rights Reserved. 24 / 46...
  • Page 25 DM Series User Manual www.roevisual.com 6.1.3 Labels on the Flight Case Warning: Indoor use. Warning: Keep the flight case upwards. Warning: Maximum stack 3 flight cases. Warning: Fragile 2020-11-23 | Copyright © 2020 ROE Visual Co., Ltd. All Rights Reserved. 25 / 46...
  • Page 26: Installation Overview

    DM Series User Manual www.roevisual.com Installation Overview Video Source 3.Main Data Cable_30m_Neutrik_Neutrik 1.Main Power Cable_10m_Weipu_Neutrik Main Power Cable_10m_Neutrik_Neutrik 4.Data Cable_0.43m_Neutrik_Neutrik 2.Power Cable_0.43m_Neutrik_Neutrik Figure 7-1. DM Series System Overview 2020-11-23 | Copyright © 2020 ROE Visual Co., Ltd. All Rights Reserved. 26 / 46...
  • Page 27: Quick-Start Guide

    (1) The adjusting range of the adjustment wheel is 13.9mm (vertical) and 157mm (horizontal) respectively. (2) Please note that there is a 7.15 mm gap between neighboring hanging bars. 2020-11-23 | Copyright © 2020 ROE Visual Co., Ltd. All Rights Reserved. 27 / 46...
  • Page 28 (4) Before installing more panels, fix hanging bars and tiles with locking plates. (5) Before installing more tiles, fix neighboring tiles with locking plates. 2020-11-23 | Copyright © 2020 ROE Visual Co., Ltd. All Rights Reserved. 28 / 46...
  • Page 29 DM Series User Manual www.roevisual.com (6) It is recommended to uninstall from left to right when uninstall tiles. 2020-11-23 | Copyright © 2020 ROE Visual Co., Ltd. All Rights Reserved. 29 / 46...
  • Page 30: Stacking System

    (3) Put the rear truss onto the base truss. Install the first panel on the stacking bar, which will attract panels to the target position automatically with magnets. 2020-11-23 | Copyright © 2020 ROE Visual Co., Ltd. All Rights Reserved. 30 / 46...
  • Page 31 (6) Install tiles on the second stacking system and fix them with 4-way locking plates. (7) Repeat Step 2 to 5 until installing all stacking systems and keep them at the same horizontal level through the adjustment wheel. 2020-11-23 | Copyright © 2020 ROE Visual Co., Ltd. All Rights Reserved. 31 / 46...
  • Page 32 -The first and the last column in a screen always needs to be connected to a stacking system. -Above 4m height the rear truss needs extra lateral support. -For more options, you can check the Ballast Calculation on 31th page. 2020-11-23 | Copyright © 2020 ROE Visual Co., Ltd. All Rights Reserved. 32 / 46...
  • Page 33 DM Series User Manual www.roevisual.com Notes: (1) The adjusting range of the feet (stacking bar) is 48mm. (2) The rear bridge should be used in even rows. 2020-11-23 | Copyright © 2020 ROE Visual Co., Ltd. All Rights Reserved. 33 / 46...
  • Page 34: Ballast Calculation

    In order to confirm the correct total ballast weight for your LED screen, we created the stacking system ballast calculator based on the ROE stacking system structural analysis reports. To use, select the corresponding options in the left of the calculator according to the wall build.
  • Page 35: Cabling

    3. Power Cable_2.4m_Neutrik_Neutrik 4. Main Data Cable_30m_Neutrik_Neutrik 5. Data Cable_0.43m_Neutrik_Neutrik 6. Data Cable_0.75m_Neutrik_Neutrik Note: The number in cabling is in line with that of in cables. 2020-11-23 | Copyright © 2020 ROE Visual Co., Ltd. All Rights Reserved. 35 / 46...
  • Page 36: Data Cabling

    (1) The front view is for the setting in the control system. (2) The cascade control data cables should not be more than 100 meters. When it's over 100 meters, please switch to fiber cables. 2020-11-23 | Copyright © 2020 ROE Visual Co., Ltd. All Rights Reserved. 36 / 46...
  • Page 37: Control System

    DM Series User Manual www.roevisual.com 10 Control System ROE provides three different control systems: Megapixel VR Helios, Brompton Tessera and ROE Evision. For more information about system operation, please check the corresponding control system user manual. 1. ROE Evision Control System User Manual 2.
  • Page 38 Step 2: Spray more and keep cleaning until the tile is clean. Note: In terms of the cleaning frequency, it depends on the actual situation. 2020-11-23 | Copyright © 2020 ROE Visual Co., Ltd. All Rights Reserved. 38 / 46...
  • Page 39: Installing Tiles

    In order to protect LEDs on edges from damage, the tile frame should be attracted by magnets first then modules (with LEDs mounted on). 11.2.1 Hanging √ × 2020-11-23 | Copyright © 2020 ROE Visual Co., Ltd. All Rights Reserved. 39 / 46...
  • Page 40 DM Series User Manual www.roevisual.com 11.2.2 Stacking √ × 2020-11-23 | Copyright © 2020 ROE Visual Co., Ltd. All Rights Reserved. 40 / 46...
  • Page 41: Replacing The Module

    Step 2: Take a new module, install it and tighten the safety rope. Note: Please note the direction of the module. 2020-11-23 | Copyright © 2020 ROE Visual Co., Ltd. All Rights Reserved. 41 / 46...
  • Page 42: Tools Needed

    5.0 ± 0.3 kg / cm Φ4.0 x 25 x 2 # PM4x8mm Module Handle 4.0 ± 0.5 kg / cm Φ4.0 x 25 x 2 # 2020-11-23 | Copyright © 2020 ROE Visual Co., Ltd. All Rights Reserved. 42 / 46...
  • Page 43: Replacing The Power Unit

    Step 4: Take a new power unit, place and fix it and the electric coupler back with screws. Note: Please note the location of yellow, blue and red terminals. 2020-11-23 | Copyright © 2020 ROE Visual Co., Ltd. All Rights Reserved. 43 / 46...
  • Page 44: Replacing The Receiving Card

    Step4: Take a new receiving card, place it back and tighten it Step 5: Place back the hub board and tighten it. Step 6: Place back the power box housing and lock four safety locks. 2020-11-23 | Copyright © 2020 ROE Visual Co., Ltd. All Rights Reserved. 44 / 46...
  • Page 45: Replacing The Tile Handle

    11.8 Replacing the Module Handle Step 1: Unscrew two screws and take down the module handle. Step 2: Take a new module handle, place it back and tighten it. 2020-11-23 | Copyright © 2020 ROE Visual Co., Ltd. All Rights Reserved. 45 / 46...
  • Page 46: Revision History

    DM Series User Manual www.roevisual.com 12 Revision History Revision Update date Remarks Editor 2021.08.17 Update control system Chris 2020.11.23 Update specification, SAP number, stacking and hanging Lance pictures 2020-11-23 | Copyright © 2020 ROE Visual Co., Ltd. All Rights Reserved. 46 / 46...

This manual is also suitable for:

Diamond dm2.6Diamond dm3.9

Table of Contents