Download Print this page

Mercia Garden Products OIDTSHRAX0806SDFW-V2 Manual

8x6 shiplap reverse apex shed

Advertisement

Quick Links

x2
2mm Drill bit

Advertisement

loading
Need help?

Need help?

Do you have a question about the OIDTSHRAX0806SDFW-V2 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products OIDTSHRAX0806SDFW-V2

  • Page 1 2mm Drill bit...
  • Page 2: Any Questions

    PLEASE SCAN HERE: ANY QUESTIONS? Scan code contact us via our customer portal.
  • Page 3 ACCESSING VIDEO GUIDES... ACCESSING VIDEO GUIDES... 3. Scan QR code... Some steps within this set of instructions come with an added video guide for your convenience. These can be accessed via the QR code and used to aid you in constructing that step.
  • Page 4 This building can be built as an Apex or a Reverse Apex. You can Before assembly Inner Door Block 28x28x150mm QTY 1 choose in which arrangement you wish to have your panels set up. please make sure you have a FS2828-150mm suitable base ready to erect your See these images on display to give you an idea of which set up is...
  • Page 5 Nail Bag Step 1 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 1 QTY 1 PLEASE SCAN HERE: There may be extra screws present in the nail bag No. 6 QTY 1 No. 24 QTY 3 Place the door (No. 6) within the Door 60mm Screw x 12 30mm Screw x 148 Panel (No.
  • Page 6 Step 4 Step 2 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 8 QTY 2 Parts needed - No. 2, (or 1, or 4 QTY 1) No. 4, (or 1, or 2 QTY 1) Place the oor panels (No.
  • Page 7 Step 6 IMPORTANT: Pre-drill before xing screws. Step 8 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 1, (or 2, or 4 QTY 1) Parts needed - No. 17 QTY 2 No. 25 QTY 2 Fix the corner and end of the Door No.
  • Page 8 Step 10 IMPORTANT: Pre-drill before xing screws. Step 11 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 9 QTY 4 Parts needed - No. 18 QTY 2 Place the Roof Panels (No. 9 on top of the Position a Roof Truss (No. 18), centrally building making sure the framing in the roof underneath the join of the two roof panels sits rmly within the Gable Tops (No.
  • Page 9 Step 12 Step 14 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 19 QTY 2 Use 40mm screws to x The Roofs Place Truss Block (No. 19) up to the Roof Truss (No. 9) down the sides and at the (No.18) so the angled cut edge is facing bottom being sure that the screws upwards, ush to the Roof Truss (No.
  • Page 10 Step 16 IMPORTANT: Pre-drill before xing screws. Step 17 Parts needed - No. 11 QTY 8 Parts needed - No. 29 QTY 1 PLEASE SCAN HERE: No. 12 QTY 6 No. 30 QTY 1 No. 13 QTY 2 No. 21 QTY 2 Cut the felt (No.
  • Page 11 Step 18 Step 20 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 16 QTY 7 Parts needed - No. 10 QTY 1 No. 15 QTY 2 Fit the Cover Trims (No. 16) over each panel join Use 4x30mm Screws to x each Door Beading and corner of the building as shown in the Strip (No.
  • Page 12: After Treatment

    Step 21 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 27 QTY 1 Screw the Pad Bolt (No. 27) on to the door (No. 1) and the retainer to the door panel (No. 6) using 10x30mm screws. Make sure that you screw into the framing behind. It is ESSENTIAL that you apply wood 10x30mm Screws.
  • Page 13 PLEASE SCAN HERE: ANY QUESTIONS? Scan code contact us via our customer portal.