Advertisement

General Instructions

0619LOG015-V5
0619LOG015-V5 : 19mm log cabin 4x3m (T&G roof)
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied)
including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm
bit.
- Ensure there is plenty of space and a clean dry area for assembly.

TIMBER

As with all natural materials, timber can be a ected during various weather conditions.
For the duration of heavy or extended periods of rain, swelling of the wood panels may
occur. Warping of the wood may also occur during excessive dry spells due to an interior
moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is
suggested that the outdoor building is sprayed with water during extended periods of
warm sunshine and sheltered as much as possible during rain or snow.

BUILDING A BASE

When thinking about where the building and base are going to be constructed:
Ensure that there will be access (60cm) to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to
diagrams for the base dimensions. The base should be slightly smaller than the external
measurement of the building, i.e. The cladding should overlap the base, creating a run
o for water. It is also recommended that the oor be at least 25mm above the
surrounding ground level to avoid ooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in
the case of childrens products independently tested to EN71 level, we cannot accept
responsibility for your safety whilst erecting or using this product.
Refer to the instructions pages for your speci c product code
Please retain product label and instructions for future reference
All buildings should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
For ease of assembly use a
rubber mallet to t the log
boards. Do NOT use a heavy
hammer.
It is advisable to use a hand
saw when cutting roof and
oor boards.
Screws & Nails
Bolts
To identify the
xings required
Measure
Measure
for each step use a
overall
under the
length
head
measuring tape.
For assistance please contact customer care on: 01636 821215
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
Ensure to measure and check before cutting
boards.
To ensure log boards are even, use a spirit
level to check each layer has been installed
correctly.
P 1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 0619LOG015-V5 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 0619LOG015-V5

  • Page 1 Winter = High Moisture = Expansion 0619LOG015-V5 Summer = Low Moisture = Contraction erected by two adults 0619LOG015-V5 : 19mm log cabin 4x3m (T&G roof) BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY For ease of assembly, you CAUTION MUST pilot drill all screw Every e ort has been made during the - Check the pack and make sure you have all the parts listed.
  • Page 2 0619LOG015-V5 Please retain product label and instructions for future reference Overall Dimensions: Width = 4028mm Log Board - 50x19x4000mm QTY 2 Depth = 3163mm LB19RG50-A-4000 Height = 2598mm Base Dimensions: Log Board - 120x19x2996mm QTY 25 Width = 3808mm LB19-A-2996...
  • Page 3 Please retain product label and instructions for future reference Felt Roof Spacers QTY 5 PI-07-0208 (20x100x2mm) Pre-assembly Nail Bag *Please note: There may be extra screws present in the nail bag Each board interlocks at either end in a staggered pattern. 60mm Bolt Set x16 30mm Screw x102 Before securing ensure that the boards...
  • Page 4 Please retain product label and instructions for future reference IMPORTANT: Pre-drill before xing screws. Step 2 Step 1 IMPORTANT: Pre-drill before xing screws. Parts Needed - No. 4 QTY 2 Parts Needed - No. 14 QTY 10 No. 10 QTY 2 No.
  • Page 5 Please retain product label and instructions for future reference Step 3 Step 5 Parts Needed - No. 5 QTY 12 Parts Needed - No. 6 QTY 12 No. 8 QTY 6 No. 7 QTY 12 No. 10 QTY 10 No. 8 QTY 6 No.
  • Page 6 Please retain product label and instructions for future reference Step 6 Step 8 Once you have laid the second Parts Needed - No. 8 QTY 1 level of boards onto the assembly No. 10 QTY 1 slide the window(s) (No. 1) No.
  • Page 7 Please retain product label and instructions for future reference Step 11 IMPORTANT: Pre-drill before xing screws. Step 10 Parts needed - No. 13 QTY 3 Parts Needed - No. 9 QTY 2 Align the Roof Purlin(s) (No. Following the same method 13) into the cut out slots on each outlined in Pre-Assembly, lay gable top ensuring each roof purlin...
  • Page 8 Please retain product label and instructions for future reference Step 12 Step 13 Parts Needed - No. 19 QTY 72 Parts Needed - No. 18 QTY 2 Place the rst two roof boards Ensuring the roof boards are ush (No. 19) onto the assembly on at the overhanging side and meet each side, making sure the boards at the apex, x the eaves frames...
  • Page 9 Please retain product label and instructions for future reference Step 15 Step 14 Roof Roof Parts needed - No. 12 QTY 7 Parts Needed - No. 20 QTY 34 Inside the building place the closure Place the rst oor board (No. 20) trim (No.
  • Page 10 Please retain product label and instructions for future reference Step 18 Step 17 Parts needed - No. 24 Parts Needed - No. 16 QTY 4 No. 17 QTY 2 Cut the felt into four strips and lay Align the fascias (No’s. 16 onto the roof in the order shown &...
  • Page 11 Please retain product label and instructions for future reference Step 19 Parts needed - No. 21 QTY 8 Arrange the storm braces (No. 21) around the building (internally). Place 2x storm braces per side xing into place using 2x 60mm bolts per brace making sure the washer &...

Table of Contents