BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips screw-
driver, Stanley knife, Wood saw, Step ladder, Hammer and a Drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions. For the duration of heavy or
extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during
excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be
helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine
and sheltered as much as possible during rain or snow.
Once your garden building has been installed it will need to be treated as soon as possible and annually to prevent
the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guarantee.
Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a waterproof treat-
ment to prevent water ingress
Pressure Treated buildings - Require a waterproof treatment to prevent water ingress
Log Cabins - Are supplied untreated and require a preservative and waterproo ng treatment.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to diagrams for the base dimensions,
The base should be slightly smaller than the external measurement of the building, i.e. The cladding should overlap
the base, creating a run o for water. It is also recommended that the oor be at least 25mm above the surrounding
ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens
products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or
using this product.
Refer to the instructions pages for you speci c product code
Please retain product label and instructions for future reference
x2
All buildings should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
For ease of assembly, you
will need a tape measure to
check dimensions of
components.
**Protim Aquatan T5 (621)**
Your building has been treated with Aquatan .
Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct
application of Aquatan solution and then allowed to dry.
Aquatan is a decorative nish to colour the wood, which is applied industrially to timber fence panels and
garden buildings.
Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl
sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
P 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 03VER1008-V2 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 03VER1008-V2

  • Page 1 - Concrete 75mm laid on top of 75mm hard-core. - Slabs laid on 50mm of sharp sand. Mercia Garden Products Limited, Sutton On Trent, Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens...
  • Page 2 03VER1008-V2 Please retain product label and instructions for future reference Overall Dimensions: Length = 3028mm Barrel Bolt QTY 6 Turn Button QTY 2 Width = 2484mm PI-07-0114 PI-07-0034 Height = 2569mm Base Dimensions: Length = 2974mm “U” Channel Width = 2360mm “L”...
  • Page 3 Please retain product label and instructions for future reference Step 2 Step 4 Fix the master and slave door to Place the oor panels upside down onto the attached side doors with a rm and level base. Ensure the base has 8x butt hinges, using 6x25mm suitable drainage, free from areas where screws per hinge.
  • Page 4 Please retain product label and instructions for future reference Step 6 Step 8 Fix the corners with 50mm Place the gable tops onto the window panels, ensuring the screws as shown in the illustration. boards interlock. Do not secure the building Secure in place using 4x50mm screws per gable top, screwing to the oor until the roof...
  • Page 5 Please retain product label and instructions for future reference Step 12 Step 10 Fix the roof support blocks centrally Align the ridge bar between the to the back and door panel upright gables and secure to the central framing with 2x50mm screws per uprights with 2x30mm screws block.
  • Page 6 Please retain product label and instructions for future referenc Please retain product label and instructions for future reference Step 14 Step 16 Repeat Steps 11, 12 & 13 to Secure the building to nish building the roof support. the oor using 38x50mm screws.
  • Page 7 Please retain product label and instructions for future reference Step 20 Step 18 Fix the rain guards above each Attach the cover trims to each window, securing in place corner of the building and using 2x50mm screws per across each joint between guard, ensuring to screw the xed panels, using 3x30mm through the framing.
  • Page 8 Please retain product label and instructions for future reference Step 22 Step 23 Place the Door support Bar(No.29) Screw through the side panel exter- to the inside of the door panel as nally in line with the 2 x 1 framing displayed in the pictures.
  • Page 9 Please retain product label and instructions for future reference Step 25 Step 24 it is recommended that after the Attach a strip to the hinged side of construction, treatment and the the middle opening doors. removal of the protective window cover that sealant is used to *These strips allow you to adjust the keep the building weather tight.