6x4 overlap reverse apex single door fixed window, 6x4 shiplap reverse apex single door fixed window, 6x6 overlap reverse apex single door fixed window, 8x6 overlap reverse apex single door fixed window, 8x6 shiplap reverse apex single door fixed window, (6 pages)
Page 3
Before assembly Support Block 150x28x28mm QTY 3 please make sure you have a F2828-150mm suitable base ready to erect your building Ridge Bar 1432x27x70mm QTY 2 F2770-1432mm Eaves Framing 1502x28x28mm QTY 4 F2828-1502mm Door Beading Strips 1600x12x28mm QTY 2 MADE IN GREAT BRITAIN S1228-1600mm Overall Dimensions: Base Dimensions:...
Page 4
Step 2 Nail Bag IMPORTANT: Pre-drill before xing screws. Parts needed - No. 1 QTY 1 There may be extra screws present in the nail bag No. 8 QTY 1 No. 24 QTY 3 30mm Screw x 111 50mm Screw x 20 Place the door (No.8) within the Door 20mm Screw x 10 40mm Screw x 20...
Page 5
Step 5 Step 3 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts Needed- No.3 QTY 1 Parts Needed- No.1 QTY 1 - No.4 QTY 1 - No.5 QTY 2 **Please note: the front and back panels are **Please note: the front and back panels interchangeable interchangeable and can be positioned on...
Page 6
Step 8 Step 7 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts Needed- No.17 QTY 2 Parts Needed- No.10 QTY 2 - No.23 QTY 2 Position a truss frame (No.17) to the - No.28 QTY 1 ridge bar sloping down towards the building side, ensure it is central to the Position the two ridge bars (No.10) ridge bar with equal distance either...
Page 7
Step 10 Step 12 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts Needed- No.19 QTY 2 Parts Needed- No.6 QTY 4 - No.11 QTY 4 Fix the truss block (No.19) in front of the support block with 2 x 50mm Fix the Eaves framing (No.11) to the screws.
Page 8
Step 13 Step 14 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 6 QTY 4 Fix the building to the oor using Place the Roof Panels (No. 6) on top of the building, 28x40mm screws, ensuring to go ensuring equal spacing either side of the building through the panel framing and into the **Make sure that you have got the roof panels the...
Page 9
Step 15 Step 16 IMPORTANT: Pre-drill before xing screws. Parts Needed- No.13 QTY 3 Parts Needed- No.21 QTY 1 - No.14 QTY 1 - No.30 QTY 1 - No.18 QTY 4 - No.22 QTY 1 Cut the felt (No.21) into 2 sheets - No.27 QTY 2 measuring 3050mm (L) x 1000mm (W) and lay onto roof as shown in diagram.
Page 10
Step 17 Step 19 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts Needed- No.15 QTY 8 Parts Needed- No.9 QTY 1 - No.12 QTY 2 Fix the cover trims (No.15) to the corners and the joins of the Fix the Door Beading strips (No.12) building, secure using 3x30mm to the door panel framing, secure...
Page 11
It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled. AFTER TREATMENT: score around protective cover on glazing and carefuly peel covering back...
Need help?
Do you have a question about the OIDTOVRA1006SDFW-V1 and is the answer not in the manual?
Questions and answers