Download Print this page

Flycam Flowline Master Female FLCM-FLN-MSTR-FM Assembly Manual

With pro vest

Advertisement

Quick Links

1
Flowline Master Female with Pro Vest
(FLCM-FLN-MSTR-FM)
A s s e m b l y M a n u a l
What's In The Box
Please inspect the contents of your shipped package to ensure you have received everything that
is listed below.
Note: If you have purchased (FLCM-FLN-MSTR-FM), you will get a jacket that fits small, medium, and large
sizes. If you have purchased (FLCM-FLN-MSTR-FM-01), you will receive a jacket that fits the XL and XXL
sizes. The assembly point will remain the same in both jackets.
Bag Packing
All rights reserved.
No part of this document may be reproduced, stored in a retrieval system, or transmitted by any form or by any means,
electronic, mechanical, photo-copying, recording, or otherwise, except as may be expressly permitted by the applicable copyright
statutes or in writing by the Publisher.

Advertisement

loading
Need help?

Need help?

Do you have a question about the Flowline Master Female FLCM-FLN-MSTR-FM and is the answer not in the manual?

Questions and answers

Summary of Contents for Flycam Flowline Master Female FLCM-FLN-MSTR-FM

  • Page 1 Flowline Master Female with Pro Vest (FLCM-FLN-MSTR-FM) A s s e m b l y M a n u a l What’s In The Box Please inspect the contents of your shipped package to ensure you have received everything that is listed below.
  • Page 2 NOTE: It is recommended to attach the minimum required weight (4kg / 9lb) for pulling down the balancing rope to ensure proper operation of your Flycam Flowline system. NOTE: Using Placid (FLCM-FLN-PLA) or Edge V1 (FLCM-EDGE-V1) with this Flowline model will impact the minimum and maximum payload capacities.
  • Page 3 • Use the strap to adjust the chest Velcro properly, Then adjust until you find it comfortable and you can set the side support adjustment rods according to your body type. Note: The side support adjustable vest rods on the sides enable a comfortable fit for all body types.
  • Page 4 YOUR FLYCAM FLOWLINE MASTER FEMALE WITH PRO VEST ALL DRESSED UP AND READY TO GO! (SHOWN WITH OPTIONAL ACCESSORIES) Warranty: We offer a one-year warranty on our products from the date of purchase. During this period, we will repair the product free of charge for labor or parts. The warranty does not cover transportation costs or products that have been misused or accidentally damaged.