Quick Links

Meter Solutions for SPH/SPA All-In-
One System in Different Scenarios
SPH/SPA 3000-6000TL-HUB/AUB All-in-One supports multi-scenario meter solutions.
Customers can choose the corresponding meter solution according to different
installation scenario requirements. If the CT cable length is less than 10m, we use the
built-in smart meter solution by default. If the CT cable length exceeds 10m, we can
use an external meter and CT solution. If there is an AC-Couple system, we can use
second meter solution.

Advertisement

loading
Need help?

Need help?

Do you have a question about the SPM-CT-G and is the answer not in the manual?

Questions and answers

Summary of Contents for Growatt SPM-CT-G

  • Page 1 Meter Solutions for SPH/SPA All-In- One System in Different Scenarios SPH/SPA 3000-6000TL-HUB/AUB All-in-One supports multi-scenario meter solutions. Customers can choose the corresponding meter solution according to different installation scenario requirements. If the CT cable length is less than 10m, we use the built-in smart meter solution by default.
  • Page 2 GROWATT SPH/SPA 3000-6000TL-HUB/AUB storage inverter has integrated with a smart meter (model: SPM-CT-G), the installer can directly connect the CT to the device for easy installation. In this case, it only suits for 10m distance between the CT and the storage inverters, to guarantee the detection accuracy.
  • Page 3 2) Wiring of the external CT Connect the CT into the Inbuild Meter1 port on the inverter as shown: Fig 3: CT wiring port 3) System configuration ①Press and hold the OK button on the LCD of the inverter for three seconds to enter the settings page ②Scroll down to the Mode Change page and click confirm ③Scroll down to the Sensor page and set it to Meter mode...
  • Page 4 1) System Introduction The configuration of the all-in-one system solutions for external meter is as shown below, with a external meter: Fig 5: System diagram 2) Wiring of the external meter and CT Connect the external meter to the Meter1/CT1 port on the inverter, as shown below: Fig 6: Meter wiring port Table 2: Wiring port description...
  • Page 5 3) System configuration ①Press and hold the OK button on the inverter for three seconds to enter the settings page ②Scroll down to the Mode Change page and click confirm ③Scroll down to the Sensor page and set it to Meter mode Note: If the inverter LCD displays warning 401, it means the meter is not connected.
  • Page 6 Fig 9: Second meter wiring port Table 3: Wiring port description 3) Second meter system configuration ①Press and hold the OK button on the inverter for three seconds to enter the settings page ②Scroll down to the RS485 Setting page and click confirm ③Scroll down to the Port page and set it to Meter 2 mode.
  • Page 7 After the meter is installed, please perform one-click diagnosis on the all-in-one machine to diagnose whether the meter connection is correct (please refer to the all-in-one machine one-click diagnosis white paper for details).