11.0 OPERATION AND INSPECTION CHECKLIST
BEFORE EACH USE, the nozzle must be inspected to this checklist:
1. There is no obvious damage such as missing, broken or loose parts, damaged labels etc.
2. Waterway is clear of obstructions
3. Coupling is tight and leak free
4. Valve operates freely through full range and regulates flow
5. "OFF" position shuts off fully and flow is stopped
6. Nozzle flow is adequate as indicated by pump pressure and nozzle reaction
7. Shaper turns freely and adjusts pattern through full range
8. Nozzle smoothly moves into full flush and out of flush with normal flow and pressure restored
9. Shaper detent (if so equipped) operates smoothly and positively.
BEFORE BEING PLACED BACK IN SERVICE, nozzles must be inspected to this checklist:
1. All controls and adjustments are operational
2. Shut off valve (if so equipped) closes off the flow completely
3. There are no broken or missing parts
4. There is no damage to the nozzle that could impair safe operation (e.g. dents, cracks, corrosion or other defects)
5. The thread gasket is in good condition
6. The waterway is clear of obstructions
7. Nozzle is clean and markings are legible
8. Coupling is tightened properly
9. Shaper is set to desired pattern
10. Shutoff handle (if so equipped) is stored in the OFF position
WARNING
TASK FORCE TIPS LLC
MADE IN USA · tft.com
©Copyright Task Force Tips LLC 2016-2024
Equipment failing any part of the checklist is unsafe for use and must have the problem corrected
before use or being placed back into service. Operating equipment that has failed the checklist is a
misuse of this equipment.
3701 Innovation Way, Valparaiso, IN 46383-9327 USA
800-348-2686 · 219-462-6161 · Fax 219-464-7155
12
LIS-040 May 21, 2024 Rev03
Need help?
Do you have a question about the VORTEX SVFT and is the answer not in the manual?
Questions and answers