Required Tools And Equipment - Cisco CISCO2515-RF - 2515 Router User Manual

User guide
Table of Contents

Advertisement

Required Tools and Equipment

Required Tools and Equipment
Installation requires some tools and equipment that are not provided as standard equipment
with the router. Following are the tools and parts required to install the router:
Flat-blade screwdrivers: small, 3/16-inch (0.476 cm) and medium, 1/4-inch (0.625 cm).
ESD-preventive wrist strap.
Screws to secure the rack-mount brackets to the router.
Cables for connection to the WAN and LAN ports:
— Ethernet AUI cable or Ethernet transceiver for connection to the Ethernet AUI port.
— Token Ring lobe cable for connection to the Token Ring port.
— Serial transition cable for connection to the synchronous serial port .
— Cable for connection to the ISDN BRI port.
Note
in the "Overview of the Router" chapter.
Ethernet 10BaseT hub or PC with a network interface card for connection to the
Ethernet AUI (LAN) port.
Token Ring MAU for connection to the Token Ring (LAN) port.
CSU/DSU or other DCE device for connection to the synchronous serial interface.
NT1 device for ISDN BRI WAN connections, if not supplied by your service provider.
Console terminal (an ASCII terminal or a PC running terminal emulation software)
configured for 9600 baud, 8 data bits, no parity, and 2 stop bits. A terminal is required
unless you are using the AutoInstall procedure. See the section "Connecting the
Console Terminal and Modem" later in this chapter for instructions on connecting a
console terminal.
Modem for connection to the auxiliary port for remote administrative access (optional).
3-2 Router Installation and Configuration Guide
For cable ordering information, refer to the section "Obtaining Service and Support"

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents