C H A P T E R 4 Installing And Removing Field-Replaceable Units; Installing And Removing A Port Adapter Or Service Adapter - Cisco 7301 Installation And Configuration Manual

Configuration guide
Table of Contents

Advertisement

Chapter 4
Installing and Removing Field-Replaceable Units

Installing and Removing a Port Adapter or Service Adapter

The information in this section also applies to service adapters. For information about configuring a port
adapter, see the
Figure 4-2
1
2
During this procedure, wear grounding wrist straps to avoid ESD damage to the card. Do not directly
Warning
touch the backplane with your hand or any metal tool, or you could shock yourself. Statement 94
Before removing any port adapter, gracefully shut down the interface so that there is no traffic running
through the port adapter when it is removed. Removing a port adapter while traffic is flowing through
the ports can cause system disruption.
The Cisco 7301 router supports OIR of the port adapter. However, if you choose to power off the router
to remove or install a port adapter, turn the power switch to the off position and then remove the power
cable. After you have replaced the port adapter or inserted a filler panel, replace the power cable and
then turn the power switch to the on position.
After powering off the router, wait at least 30 seconds before powering it on again.
Note
Follow these steps for inserting and securing a port adapter:
Attach an ESD wrist strap between you and an unpainted chassis surface. For wrist straps with a banana
Step 1
jack, insert the banana jack in its grounding hole (see
the STATUS LED and power switch.
OL-5418-07
Cisco 7301 Internet Router Port Adapter Documentation Roadmap.
Installing a Port Adapter or Service Adapter
3
SLOT 1
ATM
CIS CO 730
1
2
Port adapter latch
Port adapter

Installing and Removing a Port Adapter or Service Adapter

GIGA BIT ETHE
RNET 0/0
RJ45 EN
GIGA BIT ETHE
LINK
RNET 0/1
TX
RJ45 EN
GBIC
GIGA BIT ETHE
RX
LINK
RNET 0/2
RJ45 EN
TX
GBIC
RX
LINK
AUX
CONS OLE
TX
GBIC
RX
100-2 40V,
2A, 50/60
24V= 9A,
Hz
48 - 60V=
ALAR M
5A
1
COMP ACT
FLAS H
STATU S
4
3
4
Figure
Cisco 7301 Installation and Configuration Guide
Port adapter slot guide
Ground for ESD wrist strap banana jack
4-2) located on the front of the chassis, near
4-3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vam2 - 7301 router security bundle

Table of Contents