Unpacking The Replacement Chassis; Preparing The Chassis - Cisco 12416 Replacement Instructions Manual

Chassis replacement instructions
Table of Contents

Advertisement

Removing and Installing the Chassis
Procedures for removing and installing the chassis are described in the following sections:

Unpacking the Replacement Chassis

The process of unpacking the replacement chassis consists of opening and disassembling the shipping
package to expose the chassis on the shipping pallet, then removing the chassis and scissor-jack platform
from the shipping pallet. See the
procedures.

Preparing the Chassis

When the replacement chassis and scissor-jack platform have been placed near the rack site, temporarily
connect the central office grounding system or interior equipment grounding system to the supplemental
bonding and grounding receptacles on the router. There are two receptacles on the front flanges of the
chassis, near the lower corners of the switch fabric card cage. (See
receptacles on the top of the power interface panel on the back of the chassis. (See
bonding and grounding receptacle consists of a round bolt hole and an elongated bolt hole, surrounded
by an area of bare metal.
For more information on the bonding and grounding cable and connector requirements, refer to the
"Supplemental Unit Bonding and Grounding Guidelines" section in the Cisco 12016, Cisco 12416, and
Cisco 12816 Router Installation and Configuration Guide.
Cisco 12016, Cisco 12416, and Cisco 12816 Router Chassis Replacement Instructions
8
"Unpacking the Replacement Chassis" section on page 8
for detailed
Figure
3.) There are also two
Figure
4.) Each
78-16082-01

Advertisement

Table of Contents
loading

This manual is also suitable for:

1201612816

Table of Contents