Operation step
8,Fill refrigerant
Use electronic scale with
an accuracy of at least 0.5g
to weigh the filling amount.
9,Seal the charge pipe
① Seal the pipe 40mm
below the charge pipe
mouth with sealing
plier.
② Drop the lokprep into
the lokring stopper.
③ Put the lokring stopper
on the charge pipe,and
rotate it to distribute
the lokprep evenly.
④ Connect pipe and
lokring stopper with
press plier.
10,Tidy the pipes and
leaking check.
Make sure the connecting
①
pipes are not interference
with each other and not
impact the
compressor,motor and
other parts of the
machine.
② Check all the weld points
with leak detector.
Type: R290 (HC-290)
Quantity: check the name plate of the dryer
Picture