Installation: Start Up
Plug Case In/Turn On Main Power Switch:
•
Do not use an extension cord with this case.
•
Do not operate this equipment with a damaged cord,
plug, or outlet.
•
Ensure that the main power switch is off.
•
Plug the cord into a certified 220V electrical outlet with
ground.
•
Turn main power switch on.
•
Coil fans should turn on.
•
From inside of the case, check for discharge air from
front baffle, to confirm that the fans are functioning
properly.
•
When the case is in a start-up mode or has been idle
for a long period of time, unit may require 75 minutes
running time to pull down the temperature.
•
Turn lights on.
•
Light switch is located in the upper rear back of
merchandising area.
•
Always maintain front and rear airflow clearance of four
inches.
•
Obstruction or restriction of air can void warranty.
•
Note: Case temperature setting is determined by case
size. Temperature is controlled by a thermostat.
•
Thermostat is programmed per model at factory. No
adjustments are necessary.
Fusion® User Manual
Zephyr® User Manual
DO NOT BLOCK AIR INTAKE
Main Power Switch
Light Switch
8
8
Need help?
Do you have a question about the Zephyr SBZ2852DR and is the answer not in the manual?