Dyness Battery + Solis Inverter quick installation guide This is quick installation guide for Dyness Powerbox Pro + Solis S5/S6 Hybird inverter. Please use this guide in conjunction with: Dyness battery installation manual Battery installation video inverter installation manual AC couple Application...
Page 2
Purchase list from OSW: 1 x box of Dyness Powerbox Pro 1 x box of Solis S5-EH1P(3-6)K-L 1 x ZJ BENY Battery DC Breaker 500V/125A 2 pole (BDW-125) (Optional) 1 x meter (SDM120CT) marked with ID 2 if 3rd party PV inverter is onsite Installation Tips->...
Page 3
Installation Tips-> Dual Battery Connection ➢ Battery DC connection: External circuit breaker is required for each individual battery Additional Terminal block is recommended for combining the DC from two batteries before entering inverter. ➢ Battery communication connection: Battery to battery parallel communication cable: Please use normal Standard LAN communication cable between battery and battery.
Page 4
➢ meter connection -always use the meter that comes with the inverter at grid side to measure import/export power. meter is only required when 3 party inverter is onsite, please refer to “AC Couple Application” for more detail...
Need help?
Do you have a question about the Powerbox Pro and is the answer not in the manual?
Questions and answers