Customer Support Tamarack Solar makes every effort to ensure your mounting kit is easy to install. If you need assistance at any point in your installation or have suggestions on how we can improve your experience, call technical support at 1-800-819-7236 Ext 556 or email us at support@tamaracksolar.com.
Pole Mount Installation Manual UNI-SP/03X Components List The following parts are used in the 3-Bucket SOP Mount model: SP/03X Mount Parts List PART# DESCRIPTION OF PART QTY INCLUDED 51-3517-242 Rev E Bucket, 35.6" 51-3517-243 Rev E Clip, left 51-3517-244 Rev E...
Page 4
Pole Mount Installation Manual UNI-SP/03X Bucket Clips - Left & Right Module Rail Support Rails Optional Components (not included) Depending on mounting surface: Pole Mounting option for high wind: - 1/2” - 13 x 2”, 3”, 4” or 6” U-Bolts to match pole size with Flat and Lock Washers and Nuts - 1 per bucket Note: Square U-bolts can be used for square posts.
Page 5
Pole Mount Installation Manual UNI-SP/03X Foundation Hole and Pole Guidelines • The suggestions below are recommendations only. It is the installer’s responsibility to validate foundation parameters prior to installation, a local geotechnical report may be required to assess soil conditions. We recommend consulting with a local...
Page 6
Pole Mount Installation Manual UNI-SP/03X Step 1. Measure PV Panel Mounting Hole Distance A. Lay module(s) face down on a protected surface in de- sired orientation. Leave approximately 1/4” or more space between modules if more than one. B. Measure center-to-center distance between mounting holes on back of module, as shown, and make a note of distance.
Page 7
Pole Mount Installation Manual UNI-SP/03X Step 3. Attaching Clips to Rails A. Attach Clips to the Module Support Rails as determined by the bucket range diagrams. (Shown in previous step). Example shown at right has clips facing in on inside of rails that are facing out.
Page 8
Pole Mount Installation Manual UNI-SP/03X Step 4. Attaching Top Bucket to the Pole Unscrew hose clamp to release end. Thread each hose clamp through the sets of narrow center slots in the upper Bucket as shown. Place at the desired location on the pole.
Page 9
Pole Mount Installation Manual UNI-SP/03X Optional Mounting Methods Installer must supply additional hardware High Wind U-bolt In high wind loading conditions, in conjunction with hose clamps, use a 1/2-13 U-Bolt on each Bucket, as appropriate for the pipe size being used.
Page 10
Pole Mount Installation Manual UNI-SP/03X Step 6: Assembling Brace Rails A. Use table on page 11 to determine assembled length of Center Brace Rails and Bottom Brace Rails, based on desired tilt angle. B. Lay out the inner and outer Brace Rails so they overlap and equal the length determined in step A.
Pole Mount Installation Manual UNI-SP/03X Assembly Dimensions Use table below to determine approximate location of Buckets on pole, length of Center Brace Rails and Bottom Brace Rails based on the desired tilt angle. Find desired tilt angle in column A.
Need help?
Do you have a question about the UNI-SP/03X and is the answer not in the manual?
Questions and answers