Basic Operating Procedures - Omron NSA Manual

Table of Contents

Advertisement

3-1

Basic Operating Procedures

3-1 Basic Operating Procedures
Step 1 Install a PCI Board and set the DIP switch (using a PCI Board
3
Step 2 Install the NSA-series Industrial PC and wire it to the operating
Step 3 Make PS/2 port connections.
Step 4 Turn ON the 24-VDC external power supply.
3-2
This section describes the basic steps for operating the NSA-series Industrial PC.
and Special RAS Board monitoring functions).
In the following situations, remove the side cover and install the PCI Board or set
the DIP switch first before you install the NSA-series Industrial PC in an operating
panel.
To install and use a PCI Board.
To enable the RAS Board's special Action on Error monitoring function
(forced shutdown or forced reboot)
To set the ACFAIL signal input method for the external input port (UPS
power interrupt signal connector) to "Normally supplies 24 V; Open at
PWR-FAIL."
Refer to 3-2 Installing a PCI Board and Setting the DIP Switch.
Step 1-1
Remove the side cover.
Step 1-2
Set the DIP Switch.
Step 1-3
Install the PCI Board.
Step 1-4
Reattach the side cover.
panel.
Refer to 3-3-2 Installing the NSA-series Industrial PC in a Control Panel.
If a PS/2 keyboard or PS/2 mouse will be used, connect these devices before you
turn ON the NSA-series Industrial PC.
Note: Connect the keyboard and mouse directly without inserting a signal selector
or other device.
Connect a 24-VDC power supply.
Note: Never connect an AC power supply. Otherwise, the NSA-series Industrial
PC will be damaged.
Refer to 3-3-3 Connecting the Power Supply.
Refer to 3-3-4 Connecting the Grounding Wire.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents