Control D2D, Continued
Q
Pairing
1. To configure a Water Leak Sensor 1 as a
controller, press and hold the leak sensor's SET
button for 5-10 seconds, until the LED quickly
blinks green, then release the button.
SET Button
(5-10 seconds)
2. To configure the Valve Controller 2 as a
responder, first ensure that the valve is in the
closed position. Press and hold the controller's
SET button for 5-10 seconds until the LED
quickly blinks green, then release the button.
Upon pairing, the LED will stop blinking. This
may happen after only blinking two or three
times.
SET Button
(5-10 seconds)
22
Need help?
Do you have a question about the YS5003-UC and is the answer not in the manual?