Mounting Deserializer Boards; Connecting Components To Each Other - Allied Vision FPD-Link III STP User Manual

Table of Contents

Advertisement

Mounting deserializer boards

Burns to the skin
Electrical components get hot during operation.
Before operation, include deserializer boards in housings that disable any contact to
hot components.
Damage to electronics
• Disconnect all power supplies before installing deserializer boards.
• Reconnect power only after installation is complete.
• Mount the embedded boards, deserializer boards, and cameras on common
1. Mount the deserializer board to a mounting base using 4 M2.5 screws with
2. Prepare strain relief for all cable connections as described in
Damage to cameras and connected peripherals
If HSD STP connectors are exposed to excessive stress, they can break off from
devices. Hirose FH55 FPC connectors can be damaged easily.
• Secure cables at maximum 200 mm off the connected device, see
• See
• See

Connecting components to each other

For connecting cameras to deserializer boards, follow the instructions in
Connecting HSD STP cables
host, follow the instructions in
Deserializer Board FPD-Link III STP to CSI-2 User Guide V1.0.1
bases for strain relief.
washers.
cable connections
on page 26.
for all cable connections
on page 26.
Connecting HSD STP cables
Connecting FPC cables
on page 37. For connecting deserializer boards to the
Setting up deserializer boards
CAUTION
NOTICE
NOTICE
on page 37.
on page 39.
Connecting FPC cables
on page 39.
Strain relief for all
Strain relief
41

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the FPD-Link III STP and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

19502

Table of Contents