Fault Shutdown And Troubleshooting; Led Status Panel Testing - YASKAWA Solectria PVI-36TL-480-V2 Installation And Operation Manual

Commercial 1000vdc string inverters
Table of Contents

Advertisement

Installation and Operation Guide SOLECTRIA® PVI 25TL-208, PVI 36TL-480-V2, PVI 50TL-480 and PVI 60TL-480
4. Using the same password to enter the
be updated (LCD or DSP) and follow the prompts on the screen. See Figure 7-16.
5. When the update is successful repeat the process, if necessary, to update the next firmware (DSP or LCD).
Should the update fail, return to step 4 when prompted and repeat the process.
File Export and Firmware Update need super user rights.

8. Fault Shutdown and Troubleshooting

If a fault occurs within the system, the inverter will recognize and report via the LED or LCD panel. If this occurs,
reference the following section and serial number of the inverter prior to contacting Yaskawa Solectria Solar for
support. This will ensure the quickest time to resolution possible. If the fault is regarding a voltage issue, please
measure the AC and DC voltage at the inverter prior to calling

LED Status Panel Testing

Please see Table 5-1 for the LED Status Panel explanation and troubleshoot according to Table 8-1.
DOCR-071086-C (04/12/2024)
S
ETTING
Main Menu
Measurement Data
Setting
Power On/Off
History Record
Device Information
Setting
System Parameters
Control Command
Protection Parameters
LVRT/HVRT Setup
Power Derating Setup
Reactive Power Derating Setup
ARC Parameters
P1/2
Setting
Other Parameters
File Export
Firmware Update
P2/2
Figure 7-16 Firmware Upgrade Interface
INFO ✔
menu and select "Firmware Update". Choose the firmware to
Firmware Update
LCD firmware
DSP firmware
Please Confirm
Upgrading device firmware, please
Wait !
UPGRADE FIRMWARE
UPGRADE FIRMWARE OK, PLEASE
WAIT!
UPGRADE FIRMWARE FAILURE,PLEASE
WAIT!
Page 103 of 136

Advertisement

Table of Contents
loading

Table of Contents