User Manual V1.0-2023-10-30
9
Maintenance
9.1 Power OFF the Inverter
INSTRUCTIONS PERTAINING TO A RISK OF FIRE OR ELECTRIC SHOCK.
•
Power off the inverter before operations and maintenance. Otherwise, the inverter may be
damaged or electric shocks may occur.
•
Delayed discharge. Wait until the components are discharged after power off.
Single inverter system
4
DC Switch
PV String
PV String
3
Battery
breaker
Battery
1
2
Turn off:
DC switch lock is only
used in Australia.
Inverter
2
BACK-UP
AC circuit
3
4
DANGER
1
ON-GRID AC
circuit breaker
breaker
Loads
63
09
Maintenance
Utility meter
Utility grid