09 Maintenance

9 Maintenance

9.1 Power Off the Inverter

• Power off the inverter before operations and maintenance. Otherwise, the inverter may be
damaged or electric shocks may occur.
• Delayed discharge. Wait until the components are discharged after power off.
Step 1: Turn off the AC breaker on the ON-GRID side of the inverter.
Step 2: Turn off the AC breaker on the BACK-UP side of the inverter.
Step 3: Turn off the battery breaker between the inverter and the battery.
Step 4: (optional, only for GEH series inverters) Turn off the DC switch of the inverter.

9.2 Removing the Inverter

• Make sure that the inverter is powered off.
• Wear proper PPE before any operations.
Step 1: Disconnect all the cables, including DC cables, AC cables, communication cables, the
communication module, and PE cables.
Step 2: Remove the inverter from the mounting plate.
Step 3: Remove the mounting plate.
Step 4: Store the inverter properly. If the inverter needs to be used later, ensure that the storage
conditions meet the requirements.

9.3 Disposing of the Inverter

If the inverter cannot work anymore, dispose of it according to the local disposal requirements
for electrical equipment waste. The inverter cannot be disposed of together with household
waste.