IBM eserver x Series Installation Manual page 15

Table of Contents

Advertisement

Figure 4. Installing a UPS
5. The EXP300 is preinstalled in the bottom of your rack cabinet, or just above the
UPS. Verify that all hard drives are properly seated within the EXP300.
6. Server 1 and Server 2 are preinstalled just above the EXP300 in your rack cabi-
net. Cable-management arms for both servers are also preinstalled.
Note: If you need to access the rear of a server, rotate the lever on the cable-
management arm to the vertical position so that you can pull the arm away
from the server. Otherwise, leave the lever in the horizontal position inside
of the rack cabinet to prevent the cables from touching the rear door of the
rack cabinet.
7. The T54a flat panel monitor installs in the preinstalled keyboard tray in the rack
cabinet. See the IBM Flat Panel Monitor Rack Mount Kit II documentation for
installation instructions for your monitor and space-saver keyboard; then, return
here to verify the cabling of your cluster components.
8. Connect the flat panel monitor power cable to a PDU, UPS or a properly wired
and grounded electrical outlet. Connect the flat panel monitor and space-saver
keyboard to the appropriate ports on the console switch. Ensure that all connec-
tions are secure.
Note: The console switch is preinstalled in your rack cabinet. Verify that the con-
sole switch power cable is connected to a PDU, UPS or other properly
wired and grounded electrical outlet.
Monitor
Keyboard Mouse
Figure 5. Locating console switch connectors
Server 1 monitor port
Server 2 monitor port
A
1
2
3
4
Server 1 keyboard
Server 2 keyboard
and mouse ports
and mouse ports
Chapter 2. Unpacking and installing the hardware
Power connector
Power switch
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

340 ha

Table of Contents