®
POWER WAVE
S350
PROCEDURE
1. Be certain the machine is properly connected for the input voltage
being applied.
2. Turn the power switch ON and see that the machine goes through
the Start-up routine and the status light is steady green.
3. Turn the power switch OFF and connect a resistive load across the
output studs and a computer to the ethernet.
4. Perform the Power Wave Verification And Calibration Procedures,
see SVM251.
RETEST AFTER REPAIR
TROUBLESHOOTING AND REPAIR
(continued)
88