®
POWER WAVE
S350
REMOVAL AND REPLACEMENT PROCEDURE
REPLACEMENT PROCEDURE
1. Carefully position the new control board onto the mounting studs.
2. Using a 3/8" nutdriver, attach the three nuts securing the control
board to the machine.
3. Connect plugs J4, J11, J12, J5, J6, J7, J8 and J9 to the control
board. See Wiring Diagram.
4. Connect the ethernet cable to J15 on the control board. See
Wiring Diagram.
5. Perform the Case Cover Replacement Procedure.
6. Perform the Retest After Repair Procedure.
CONTROL BOARD
TROUBLESHOOTING AND REPAIR
(continued)
70