Worcester HEATSLAVE 9.24 RSF Installation And Maintenance Instructions Manual page 32

Wall hung combination boiler for central heating and mains fed domestic hot water
Hide thumbs Also See for HEATSLAVE 9.24 RSF:
Table of Contents

Advertisement

lgl Unscrew the
two
M4 wing
nuts
and wa5hers
,
one
from
each side of the
fluE!
hood
assembly.
(hl
Ease the
flue
hood assembly
off
the
heat exchanger
and
clear of the
boiler
casing.
Remove the
burner.
(i)
Slacken
the
two
M5 screws
locatins
the
air
guide
to1he
combustion
chamber.
Using
the
keyholes.
ease the
air
guide plate off the
screws and out of the
boiler
casing.
(j
l
Remove
t
he four
MS
screws
securing the f
ront
of the
combust
ion
chi!!mber.
Remove t
he
front face of
the
combustion chamber.
lk) Unscrew the
pilot
tube
retaining nut
from
the
pilot
bracket.
Pull
outthepilotsupplypipeandremovethepilot
injector.
{II
Pull
the cable
f rom
t
he spark
electrode.
(mj
Remove
the two
M5
screws at
the
front of
the
burner
holding the burner
pedestal
to
the
gas
manifold.
(n)
Slide
the burner out
of
the
rear locations
and
remove
from
boiler
cas ing.
NOTE:
An
'0'
ring seal
wiil be
found
in
the
burner
foot which
seals
w ith the
gas
manifold
flange.
This should be
removed
and
retained
for
assembly
.
4.
CLEANING THE FAN
Inspect the
fan
motor
and
fan
impel! or
for
cleanliness.
Any
accumulation
of
dust
orfiuff
should
be carefully
removed
using
a soft
brush
or
by
blowing. No sharp
instruments
to be
used which may damage the fan motor
or
fan wheel.
5.
SERVICING THE BURNER
{See
Fig.
33.)
(a)
Brush
the burner
top
and check the flame
p
orts
are
clear.
Any blockages
may
be
removed
using
a
suitable brush
.
tb)
Clean
the
pilot
shield and pilot burner.
Removethepilot
shield by
unscrewing
the two
M4
screws
and
nuts.
Clean if
necessary.
Remove the pilot
bracket
and
electrode
by
unsctewing
the
two
M4 screws. Clean if
necessary.
(c)
Reassemble the pilot burner and electrode w ith
the
two
M4 screws.
Reassemb
le
the pilot shield with the
two
M4
screws
and
nuts.
{d
1
Remove the burner
injector.
Clean any
deposits
f
rom
the
injector
and ftom the burner
venturi
using
a
suitable
brush.
(el Clean any
deposits
from
the
pilot
injector
by rinsing
in
warm water
or using
a suitable brush.
NOTE:
Do
not
use a wire
brush
or any other
implement
likely
t
o
cause damage
.
6. CLEANING THE HEAT EXCHANGER
(See Fig.
34.)
(a
)
Cover
the
open end of the gas manifold and
the
pilot
supply
pipe
and
controls contained
in
the lower part
of
the
appliance.
(b)
Using a suitable
brush
clean the
heat
exchanger fins
f
rom
above
and
below.
NOTE:
The insulation
used
on the
inside
surfaces
of
the
combustion chamber
is
delicate.
Great
care
should
be
taken
when c!eantng
th
e
heat
exchanger
not
to
abrade
it.
No
attempt
should be
made
tO
clean
the
insulation and the sections should
be
replaced if
there is
any
visible
deterioration whatsoever.
7.
RE-ASSEMBLE
Reassemble
t
he
appliance
in
reverse
order
to
the
dismantling
procedure.
(a)
Refit
the burner injector
t
o
the
burner.
NOTE:
Thread sealing compound shall
hot
be
used to
seal
the
injector.
(b)
Inspect
the
'0
'
ring seal, if
there is
any sign of damage
or
deterioration it must be
replaced.
(cl
Refit the
'
0'
ring
seal
into
the burner
foot
an
d
teplacethe
burner in position under
t
he
combustion
chamber.
Ensure
the burner
is
f
itted
correctly
in
the
reat location,
the
·o·
·
ring
se
al
is
not displaced and the pilot tubing
is
not
damaged.
32
(d
I
Refit
the
two
M 5
screws
holding t
he
burner
pedestal
to
the gas manifold
.
(e)
Reconnect
the
cable
to
the
electrode.
(f)
Refit
the pilot
inject
or and
the pilot
supply pipe
to
the pilot
burner assembly making sure
t
hat
the pilot injector
is
clean
and
not
blocked
.
T he
spark
electrode
should
be
replaced
if
it
shows
signs of damage or
erosion.
[See
Section
1
6,
part
4
Rep
lacement
of Parts.)
(g}
Replace the
f
ron
t
face of the combustion
chamber and
hold it in position using
the four
M5
screws.
Leave
screws
loose
.
(hi Replace the air
guide
plate
to
the combustion chamberand
tighten screws
t
o
secure
air
guide plate
and
combustion
chamber.
(i
)
lnspecttheflue
hood
assembly
sealing
gasket and replace
if damaged
.
See
Section 16,
Replacement of
Parts
,
lnstruction
7.
(jl
Replace t
he flue
hood assembly
posit
ioning
it centraHy
overt he
heat
exchanger.
Ensure
the two extension bolts
are located. Secure wit
h
the t
wo
M4 wing
nut
s
and
washers.
(k)
Reassemble the flue duct
dam
ping
ring
to
the flue duct
housing and secure
wit
h
the two extension w
ing
bolts.
Ensure tt:e
extension
w ing bolts pass t!"'rough the
clearance holes
in
t
he flue
duct
housing
and engage
in
t
he
threaded holes in
the
fl
ue
duct clamping
ring
.
PI
Slide the
tan
assembly iully inta
the
locations and secure
in
position with the M4
screw.
lm)
Reco
nnect the flexible tu
be
to the
lofthand side
oft
he
f
an
housing and electrical
c
onnec
tion
to the plug -in terminal
strip fixed
to
the
right-hand
side
of the boiler
casing.
(n
I
Inspect
the
flue terminal and ilue
t erminal
g
uard
if fitted.
8.
TEST THE PILOT SUPPLY
PIPE FOR
GAS
SOUNDNESS
(a
I
Ease
the two
pink wires from
t
he
terminals
on
the lefthand
side
of
the
gas
valve
.
(bl
Position
the User's Operating
Switch to
OFF
or,
if
a
programmer
is
fitted
position
the
two programme
selector
switches to
OFF.
(cl
Turn
on the
gas
at the gas service
cock
and
recon
nect
t
he
electricity
supply.
~d
)
Posi, ion
the users
operating switch to
HEATING
AND
WATER
or,
it
a
programmer
is
fitted
posit
ion
the
two
programme selector switches to
2.4
hrs
setting. turn
t
he
room
thermostat
to maximum.
NOTE:
(i)
A
continuous
spark will
occur
u
ntil
the
pilot
is alight and
sensed
by the
electronic
circuit
.
!iil
The
fan
will
run
but the main burner
w
ill not
ligtlt.
fe)
Test
for
gas soundness at
t
he joint between the
pilot
supply
pipe
tubing nut
and
the pilot bracket with
leak
detec tion
f lu id
.
(f}
Position the
Users
Operating
Switch
to OFF
or, if
a
programmer is fitted
position
the
two
programme
selector
switches
t
o
OFF.
Disconnect the electrical
supply
at
t he
mains.
(g)
Reconnect the
two
pink wires
to the
tl!r
minals on
the
left
hand side
of the gas valve,
polarity
is
not
important.
{h)
Inspect
the boiler inner
cover
sealing
gasket
.
If
there
is
damage or deterioration
re place the
boiler
front
cover.
(i)
Replace
the
boiler
in ner
cover
.
Ensure
the
gasket
seal
is
correct
ly
locat
ed.
Fasten
w
ith
the six
M5
screws
prev1ously
removed
.
Tighten the
screws
evenly and
$Uffidentiy
to
ensure
there is
no alr
leakage around
the
boiler
i
nner
cover.
9. TEST APPLIANCE ANO INSTALLATION
(a)
Ensure that
t
he
gas
is turned on at
the
gas service
cock
and reconnect the
elect
ricity supply.
tbl
Ensure t
hat
the
Users Operating
Switch
is
OFF
or.
if
a
programmer is
fitted
,
position
the
two
programme
selector
switches
to
OFF.

Advertisement

Table of Contents
loading

Table of Contents