Commission The Appliance - Worcester HEATSLAVE 9.24 RSF Installation And Maintenance Instructions Manual

Wall hung combination boiler for central heating and mains fed domestic hot water
Hide thumbs Also See for HEATSLAVE 9.24 RSF:
Table of Contents

Advertisement

Fig. 26. Room thermostat and
frost thermostat
connections.
ROOM lHERMOSTI\T CONNECTIONS
Romove
link.
Hor;~ywell
ro,:,tn
thermostat
T6060B
[or
similllr.l
FROST THERMOSTAT CONNECT IONS
Honeywell
frost
therm
ostat
T
4160A
~o<
similar
.1
240V.
-50Hz
BOILER MAINS SUPPLY
13.
COMMISSION THE
APPLIANCE
See
Figs.
3
0 an
d
31
.
1.
Primary
Installation:
Before
connecting
t
he
appliance to
t
he
primary
system
it
must be
flushed
t
hrough
w
ith
clean
water.
2
.
Gas Installation: tile whole
of the gas
installation including
the meter shall be
in~>pected
and tested
for
soundness,
and
purged
in
accordance w ith the
reco
mmendations of
BS
6891
.
3
.
Check
that the
gas
se
rvice
cock
is o1f
and
the electrical
supply
is off.
turn the
thermostat knob to maximum
,
do
not fit
the inner
cover.
4
.
Open
all rad
iator
valves and
fill
the system venting as
necessary.
The
appliance is
f
itted w
ith a
manual
air
vent
on
the
outlet
of t
he
black
heat
exchanger.
See
Fig.
40.
Check
for
water
soundness.
5
.
Drain the heating
system and
boiler
completely
and
refill
t
he
system venting as
detailed
in Instruction
4
.
6
.
Po sition the U
ser's
Ope
rating
Swi
t
ch
to
OFF.
If
a
programmeris
fitted, switch both hotwaterandheating
selector
switches
to
OFF.
Switch
the electrical supply off.
7
.
Test
t
h
e
pilot supply
p
ipe
for
gas
soundness
and
adjust
the
pilot flame
.
(a
)
Ea::iethetwoptnk
wires
l
romtheterminalsonthe
lefthand
side
of
the gas
valve.
lb}
Ensu re
Instruction
6 has
been
carried
o
ut
.
26
(c)
T
urn
on the
gas
at the gas
service
c
ock and
reconnect
the
electricit
y
supply.
{dl
Position
the users
operating
switch to
HEATING AND
WATER
o
r
if a
programmer i
s
fitted posit
ion
t
he
two
programme
selector switches
to
24
hrs
setting.
Turn
the
room
thermostat
to
maximum.
NOTE:
W
A
contin
uous
spark
will occur
until
t he
p
ilot is
alight
and
sensed
by
the
electronic
circu it.
(i
i
1
The
fen
will run
but the
main
burner
w ill not
light.
(e)
Test f
o
r
gas soundness
at
the
joint
between the pilot
supply
pipe
t ubing
nut
and
t
he
pilot bracket
with le
ak
detection f
lu id
.
If)
Obsetvethepilotflame.
ttshou ldbebetween20mm<md
25mm
{0.
75
in
.
1lind
l
.Oin.
}
!ong anden.,elope
the
tip
of
t
he
spe~rk
elect
rode.
{g
1
Toadjust
t
he length of
t he pilotflame.
turn the
pilotthrottle
screw
on
t
he
gas valve
.
Clockwise to
decre ase
and
anti-
clockwiseto
increase
t
he lengtli
ott
he
flame
.
See
Fig.
30.
(h
)
Position
the Users
Opera
ting
Swit
ch
to
OFF
or
if
a
programmer is
fitted
posit ion
the
two
programme selector
switches
t
o
OFF.
Disconnect
the
electr
ical supply
at
the
mains.
(i)
Reconnect
tha
two
pink w i1es
t
o
the
terminals on
the left
hanc
side
of t he
gas
valve.
Po larity is not
important.
ljl
Replace
th
e baiter inner
cov
er
and
ensure
t
he
gasket
seal
is
correctly
loc
ated
.
Fasten
with
the
six
M5
screws
previously
removed
.
Tighten
the
screws
evenly
and
sufficiently to ensure
there
is
no
air
leal<:age around
the
boiler
in
ner
cover.
8.
Loosentheburnerpr essurett<st
point
screw
one turn
and
co
nnect
a
pressure
gauge,
See
Fig.
30.
9.
Position
t
l'le
Users
Operating
switch
t
o
HEATING AND
WATER,
or
if
a programmer
is
fitted,
position
selector
switches to 24 hrs
setting
.
Turn
the
room
thermostat,
if
f
itted, to maximum.
NOTE: The
appliance is
fully
sequence
controlled
.
In
this
mode
of
operation
a
cont
inuous
spark
will
occur
until t
he
pilot
is
alight
and
sensed by
the
electronic
circuit
.
The
main
burnef will
then
light
automatically and
smoothly.
Check
the pilot shape and
size.
Refer
to
item
7t and
7g
f
or sizes
and method
of
adjustment.
lftne
pilot and
burner
will
not
ligl'lt contact Worcester Heat
System
s
Service
Dept.
Test
all
joints
and components
for
gas
soundness
using
leak
detection
fluid.
1
0
.
Check
t
hat
t
he
c
irculating pump
is
operating
c
orrectly by
t
he circulatio
n
of water
around
thP.
heati ng
svslem
.
Position
the
User
's
Operating
Switch
to WATER ONL Y
or
if
a
programmer is
fitted.
positi
on
the
central
heating
sel ector
switch
to OFF
.
11
.
fa
)
Turn on
a
hot
watertaptomaximum.
Check
11' 1
atthe
gas
pressure is between
15 and 16m
bar.
(6.0-6.4
in.wg.)
.
I
f
th
is
pressure is
low che
ck that
the
supply
pres
sure to
the
gas
valve
is at
least
19m
bar.
(7
.
5
in
.
wg
.).
(b)
After
a
short
warming up
period
t
he
gas
pressure
w
ill
modulilte
and t
he w
ater
temperature
remain
constant.
To
check
the
min imum g
as
pressure it m
ay
be
necessary to
reduce
the
water flow
at
the tap
if the
water
inlet
temperature
islow.
The
m inimumgaspressureisbetween
3 .0
and
3.5
m
bar.
11
.2
and 1.4
in. w
g.l
.
NOTE:
The
hot
water gas pressure
adjustm
ent is factory
set, and,
if
after
establishing
the supp ly
pressu
re it
~s
not
sufficient,
W
orcester
Heat Systems
Service
Departmen
t
should be contacted
.
(c)
A water
fiow
restrictor
is fitted
w
ithin
t
he
app~iance to limit
flow
rate
to
a
nominal
rate
of 8
.5
±
15
%
lit
re stmin
.
11.8
gallons/min .).
I d)
Using
a suitable measuring
device check
the
water
f
low
rate.
(e) Turn
off
the
hot
water
tap.
The
pump
will
co
ntinue
runnin9
unti
l t
he boHer
has cooled
to
a
pre-det
erm
ined
temperature
.
Any
residual
heat
w
ill
be
dissipated
in
the
rad iator
c
ircu
it
.

Advertisement

Table of Contents
loading

Table of Contents