Installation Checklist - Kalamazoo Gaucho Use And Care Manual

Table of Contents

Advertisement

Installation Checklist

Installer should initial next to each item:
Specified clearances maintained.
No overhead combustible structure.
Initial assembly completed — all tape and internal packaging removed (see Figure 5):
Wheel installed
Ash pan installed and firebox chute closure installed
Control knobs installed
Rotisserie rod and forks installed
Primary cooking grates installed
Cooktop burner diffuser caps installed (model-dependant)
Cooktop burner grate installed (model-dependant)
Cooktop cover installed (model-dependant)
Grill connected to grounded, outdoor-rated extension cord and GFI circuit.
Hot surface igniters for starter burners glow when control knobs are held in on AC power.
Control panel lights working.
Rotisserie motor working.
Each burner control valve low setting adjusted to minimum stable flame height.
Starter burners light within 4 to 5 seconds following lighting procedure.
Cooktop burners (model-dependant) light within 4 to 5 seconds following lighting procedure.
External manual shut-off valve is installed and accessible.
Homeowner informed of external shut-off valve location as well as shut-off valve inside grill (model-
dependant).
40
KalamazooGourmet.com

Advertisement

Table of Contents
loading

This manual is also suitable for:

K750gsng

Table of Contents