Setup
Connect Electrical Cord
Electrical Requirements. See Table 1.
Installing this equipment requires access to parts
which may cause electric shock or other serious
injury if work is not performed properly. Have a quali-
fied electrician connect power and ground to main
power switch terminals, see F
installation complies with all National, State, and
Local safety and fire codes.
Table 1: Electrical Requirements
(kW/Full Load Amps)
Voltage
Model
(phase)
230V
230V (3)
400V
400V (3)
* Full load amps with all devices operating at maximum
capabilities. Fuse requirements at various flow rates and
mix chamber sizes may be less.
20
. 14. Be sure your
IG
Full Load
System
Peak Amps*
Watts
17
4000
18
3200
NOTE: Power cord is not supplied. See Table 2.
Table 2: Power Cord Requirements
Model
Cord Requirements AWG (mm
230V
10 (5.3), 3 wire
400V
10 (5.3), 4 wire
Electrical Cord Wires by Model
230V, 3 phase: L1, L2, L3
400V, 3 phase: L1, L2, L3, N
Use 5/32 or 4 mm hex allen wrench to connect three
power leads to L1, L2, and L3.
L3
L2
L1
F
. 14: 230V, 3 phase shown
IG
L3
L1 L2
N
F
. 15: 400V, 3 phase shown
IG
2
)
3A0238G