Download Print this page

Advertisement

Quick Links

1.
Overview
1
(1)Front panel
(2)Touch button
(6)Heat sink
(7)DC switch
(11)Vent valve
(12)AC terminal
Note:
Dual MPPTs for MOD 3-11KTL3-X&MOD 3-6KTL3-X(NDS), one string input per MPPT. Dual MPPTs for MOD 7-11KTL3-X-AU&
MOD 7-11KTL3-X-AU(NDS)&MOD 12-15KTL3-X &MOD 12-15KTL3-X(NDS) , one MPPT has one string, and other one has two strings.
Note:
1. This document is for quick installation guidance only, please refer to User Manual for more details.
2. Growatt shall not be liable for any damage resulting from unproper installation.
2.
Installation
System overview
2.2
Wall mounting
154
77
Note:
1.When drilling holes in the wall, avoid water and electricity pipes, otherwise it may cause danger.
2 3 4
(3)LCD screen
(8)PV terminal
2.1
Installation requirements
≥300mm
MOD 7-15KTL3-X&MOD 7-11KTL3-X-AU&
MOD 7-11KTL3-X-AU(NDS)&
MOD 12-15KTL3-X(NDS) Quick Guide
5
6
7
(4)LED indicator
(9)RS485 port
≥500mm
≥300mm
≥500mm
8
9
10
11
12
(5)Mounting bracket
(10)USB port
425.2
171.8
87.4
186.4
178.4

Advertisement

loading
Need help?

Need help?

Do you have a question about the MOD 7-15KTL3-X and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Growatt MOD 7-15KTL3-X

  • Page 1 MOD 7-11KTL3-X-AU(NDS)&MOD 12-15KTL3-X &MOD 12-15KTL3-X(NDS) , one MPPT has one string, and other one has two strings. Note: 1. This document is for quick installation guidance only, please refer to User Manual for more details. 2. Growatt shall not be liable for any damage resulting from unproper installation. Installation System overview Installation requirements 425.2...
  • Page 2 Communication module installation Install Uninstall Inverter side ▲Up Inverter side Inverter side Inverter side Electrical connection Please prepare the cable before connecting as follows. Cable name Type Recommend model Note: Protective Single multi-core 6mm² grounding wire yellow-green wire 1.Please make sure all switches are in “OFF” position before wiring.
  • Page 3 3.3.2 Plug in PV terminal Note: 1.Before installing the PV terminal, please double-check that the PV input voltage and current do not exceed the MPPT limits. 2.When installing the PV terminal, pay Click attention to the difference between the positive and negative poles and the one-to- one correspondence between the terminals and the machine.
  • Page 4 Export Limit Rate of 5kW XXX.X% inverter should be 80%. Service and contact Shenzhen Growatt New Energy Co., Ltd 4-13/F, Building A, Sino-German(Europe) Industrial Park, Hangcheng Ave, Guxing Community, Xixiang Subdistrict, Bao’an District, Shenzhen, China +86 755 2747 1942 service@ginverter.com...

This manual is also suitable for:

Mod 7-11ktl3-x-auMod 7-11ktl3-x-au(nds)Mod 12-15ktl3-x(nds)Mod 3-6ktl3-xMod 3-6ktl3-x(nds)Mod 3-15ktl3-x/xh ... Show all