Download Print this page

Advertisement

Quick Links

1.
Overview
(2) Touch button
(1) Front panel
(6) Heat sink
(7) DC switch
(11) USB port
(12) Vent valve
Note:
1. This document is for quick installation guidance only, please refer to User Manual for more details.
2. Growatt shall not be liable for any damage resulting from unproper installation.
2.
Installation
System overview
Inverter
PVArray
Grid
DC
Breaker
Breaker
BAT
Load
2.2
Wall mounting
154
77
Note:
1. When drilling holes in the wall, avoid water and electricity pipes, otherwise it may cause danger.
(3) LCD screen
(8) PV terminal
(13) AC terminal
2.1
Installation requirements
Electrical Grid
AC
Breaker
MOD 3-10KTL3-XH/MOD 10KTL3-XH BE
Quick Guide
(4) LED indicator
(9) Battery terminal
425.2
171.8
87.4
(5) Mounting bracket
(10) COM port
186.4
178.4

Advertisement

loading
Need help?

Need help?

Do you have a question about the MOD 3-10KTL3-XH and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Growatt MOD 3-10KTL3-XH

  • Page 1 (12) Vent valve (13) AC terminal Note: 1. This document is for quick installation guidance only, please refer to User Manual for more details. 2. Growatt shall not be liable for any damage resulting from unproper installation. Installation System overview Installation requirements Inverter 186.4...
  • Page 2 Communication module installation Install Uninstall Inverter side ▲Up Inverter side Inverter side Inverter side Electrical connection Please prepare the cable before connecting as follows. Cable name Type Recommend model Note: Single multi-core Protective vgrounding wire 6mm²-10mm² yellow-green wire 1.Please make sure all switches are in “OFF” Two or three polychromatic position before wiring.
  • Page 3 3.3.2 Plug in PV/BAT terminal Note: 1. Before installing the PV terminal, please double-check that the PV input voltage and current do not exceed the MPPT limits. 2. When installing the PV terminal, pay attention to the difference between the positive and negative poles and the one-to-one correspondence between the terminals and the machine.
  • Page 4 ExportLimit Rate system,then the Export Limit Rate of 5kW XXX.X% inverter should be 80%. Service and contact Shenzhen Growatt New Energy Co., Ltd 4-13/F, Building A, Sino-German(Europe) Industrial Park, Hangcheng Ave, Bao’an District, Shenzhen, China +86 755 2747 1942 service@ginverter.com www.ginverter.com...

This manual is also suitable for:

Mod 10ktl3-xh beMod 3-15ktl3-x/xh