Yaesu FT-817ND Operating Manual page 13

Hf/vhf/uhf all mode transceiver
Hide thumbs Also See for FT-817ND:
Table of Contents

Advertisement

FNB-85 N
Charging
Charging of the FNB-85 requires the use of either the supplied NC-72B/C* charger, or an
external 13.8 Volt (±15%) DC source. If the NC-72B/C is used, the FT-817
turned off during charging; if an external 13.8 Volt DC source is used (connected via the
supplied E-DC-6 cable), then you may operate the FT-817
1. Turn the FT-817
tor to the INPUT: 13.8V
2. Plug the NC-72B/C into the nearest AC wall outlet.
3. Press the FT-817
4. Press the
key momentarily.
5. Rotate the
on the display.
6. Press the
key to select the CHG option (the display will immediately revert to the
regular frequency display).
7. Turn the FT-817
above the main tuning dial is glowing Orange, and the display
will indicate "CHG TIME RMN" and "7:59" to indicate the time
remaining before a full charge is achieved on the FNB-85.
For Charging the optional FNB-72 Ni-Cd Battery Pack
If you wish to charge the optional FNB-72 Ni-Cd Battery Pack using the supplied
NC-72B/C Battery Charger, you must set the Battery Charging Time to "6 Hours"
via Menu #11, to prevent over charging the battery. See page 61 for detail.
FT-817
Operating Manual
-MH B
I
ATTERY
off (see page 18), then connect the supplied NC-72B/C DC connec-
ND
jack on the rear panel of the FT-817
's
switch for one second to turn the transceiver on.
ND
knob so that the function row containing " [ CHG, VLT, DSP ] " appears
off. You will now observe that the LED just
ND
Important Notice
I
NSTALLATION
P
I
ACK
NSTALLATION AND
while charging is in progress.
ND
U
SE
must be
ND
.
ND
11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents