Miele Little Giants PWM 908 LW Operating And Installation Instructions page 23

Table of Contents

Advertisement

Completing the commissioning
process
To complete the commissioning
process, the Normal program must be
run without laundry and without deter-
gent.
If the power is interrupted prior to the
start of the first wash program (e.g., if
the machine is switched off with the
 sensor control), the initial commis-
sioning process can be completed
again.
Once a wash program has been run-
ning for over 20 minutes, the initial
commissioning process does not have
to be performed again.
 Turn on the faucets.
 Touch the
Programs
Programs
Normal
Cottons Plus
Minimum Iron
 Touch the
Cottons Plus
Overview
Temperature
60 °C
Normal
Extras
not selected
1:07
h
 Timer
 Touch the Start/Stop sensor control.
 sensor control.
Whites
Express
Delicates
 sensor control.
Spin speed
1500
rpm
CapDosing
not selected
Initial commissioning
When the program has finished, your
machine is ready for use.
If you have activated disinfection
programs, you must complete the
Thermal disinfection program as the
first program; make sure you use a
suitable detergent but do not load
the machine.
11:02
11:02
23

Advertisement

Table of Contents
loading

This manual is also suitable for:

Little giants pwm 908Little giants pwm 908 el dp

Table of Contents